Part of the Wolffkran Group โ€” German Engineering Since 1854 Wolffkran Group โ€” Since 1854
Fast UK Delivery on All Orders
London & Sheffield Offices
CE Marked & UKCA Certified Equipment CE Marked & UKCA Certified
Buy or Hire โ€” Flexible Equipment Solutions Buy or Hire Available
HIRE & BUY
Free Fast Delivery Available
Sale!
Wolffkran Group Since 1854
30-Day Returns No questions asked
UK Stock Fast dispatch
UK Support Sheffield & London
Product Code: CAM-CP

Camlok CP Pile Clamps

  • โœ“ Sheet steel pile pitching clamp, 2000kg-5000kg WLL
  • โœ“ Supplied with 15m release rope and shackle
  • โœ“ Not for extracting driven piles
  • โœ“ Made in UK, CE marked

Delivery time: 1-3 working days

UK Delivery

UK mainland delivery from FREE

Wolffkran Group Since 1854
30-Day Returns No questions asked
UK Stock Fast dispatch
UK Support Sheffield & London
  • Product Details

Camlok CP Pile Pitching Clamp

2000kg to 5000kg WLL | Pile Pitching Clamps for Trench Shield & Sheet Pile Handling | CE Marked

Product Overview

The Camlok CP pile pitching clamp is a heavy-duty lifting attachment for sheet piles, trench shield panels, and similar steel sections used in groundworks, marine construction, and civil engineering. Three capacity ratings cover most pile-pitching applications: CP2 (2000 kg), CP3 (3000 kg), and CP5 (5000 kg). The CP is engineered for the demanding environment of pile-handling on construction sites.

CE Marked, UKCA Compliant & LOLER 1998 Ready

The Camlok CP pile pitching clamp is CE marked, UKCA compliant, and supplied with certification. Fully compatible with LOLER 1998 and PUWER 1998 when used within rated capacity.

Key Features & Benefits

  • Three capacity ratings — CP2 (2000 kg), CP3 (3000 kg), and CP5 (5000 kg) WLL.
  • Pile-pitching specific design — engineered for the precise demands of sheet pile and trench shield handling.
  • Heavy site-grade construction — built to withstand the rough environment of groundworks and civil construction.
  • Self-locking action — gripping force increases with load.
  • Forged components — designed for repeated site cycling.

Typical Applications

Sheet piling operations, trench shield deployment and recovery, marine construction, civil engineering groundworks, and similar pile-handling applications where heavy steel sections must be lifted and pitched by crane.

Inspection & Maintenance

A visual inspection is required before every use. A thorough examination by a qualified engineer is required at least every 6 months in regular use, in accordance with LOLER 1998. Records of examination must be kept. Refer to the manufacturer's manual for detailed inspection and maintenance instructions, derating factors for use, and replacement schedules for any wearing components.

Warranty & Support

Supplied with manufacturer's certification, identification, and operating instructions. WOLFF Onsite offers post-sales support including spares, certified inspection, and replacement. Contact our team for advice on selection, sizing, and application-specific configurations.

Downloads & Resources

Hire WOLFF Onsite

How it works

At WOLFF Onsite, weโ€™ve made renting equipment an effortless experience. Our streamlined process ensures you have fast access to quality equipment and heavy lifting accessories, tailored specifically to your project needs, exactly when you require them.

Currently, we operate on an enquiry basis. Simply reach out with your requirements, and our team will respond promptly with a customised quote to match your project scope and timeline.

From initial consultation to final handover and ongoing, we offer full support every step of the way, guaranteeing that your rental experience runs smoothly and efficiently.

Get in Touch

Contact our team to discuss your project requirements and choose the right equipment.

Tailored Quotation

Weโ€™ll provide a customised quote based on your needs and rental period.

Delivery & Setup

Our experts deliver and set up the equipment at your site.

Ongoing Support

Receive full support throughout the rental period to ensure everything runs smoothly.

Call Us

01709 437141

Email Us

hello@wolffonsite.co.uk

Monโ€“Fri: 8:30am โ€“ 5:00pm

Part of WOLFFKRAN, trusted since 1854

Delivery Information

From our depot to your site, every order is fully tracked and delivered on our own WOLFF Onsite vehicles or via trusted courier partners. Delivery costs are calculated based on your postcode and order size.

Pallet Delivery
Dispatched within 1โ€“2 working days, delivered next working day between 8amโ€“5pm, Monday to Friday. Delivery cost is based on the number of pallet spaces and your delivery zone.

Parcel Delivery
Smaller items like radio accessories and safety equipment ship via tracked courier at a flat rate. Deliveries between 8:30amโ€“5pm, Monday to Friday.

RENTAL Delivery / Collection
All rentals are delivered and collected by the WOLFF Onsite team. We'll confirm a delivery time that works for you and arrange collection within 3 working days of your hire end date. Deliveries and collections between 8amโ€“5pm, Monday to Friday, Saturday collections can be arranged if suitable.

Dispatch Times
Orders placed by 1pm are dispatched same day where possible. Some products carry a manufacturing lead time, this is always stated in the product description.

Need Help?
Call us: 01709 437 141
Email: hello@wolffonsite.co.uk Available 8:30am - 5pm Mon-Fri

We are happy to help with any delivery or product questions.

Part of WOLFFKRAN, trusted since 1854