Mon — Fri: 8:30am — 5:00pm
Sat — Sun: Closed
London & Sheffield Offices
Part of the Wolffkran Group
German Engineering Since 1854
Mon — Fri: 8:30am — 5:00pm
Sat — Sun: Closed
London & Sheffield Offices
Part of the Wolffkran Group
German Engineering Since 1854
Estimated delivery: by Tue 14 Jul
UK mainland delivery from FREE
Model CPA/VFT ATEX | Pneumatic Chain Hoist with Powered Air Trolley | Zone 1 & Zone 21 | 2000โ10000 kg
The Yale CPA/VFT ATEX combines a heavy-duty pneumatic chain hoist with an integrated air-powered traversing trolley, delivering full overhead crane functionality from a single ATEX-certified unit across capacities from 2000 kg to 10000 kg. All functions โ lift, lower and trolley traverse โ are pendant-controlled from a single station, enabling fast, single-operator load handling in Zone 1 and Zone 21 hazardous areas, with 100% duty rating and unlimited motor starts.
| Item # | Description | Capacity (kg) | Lift (m) | ATEX Class |
|---|---|---|---|---|
| N08505017 | CPA/VFT ATEX 20-8 2t/1 | 2000 | 3 | Basic |
| N08505018 | CPA/VFT ATEX 30-6 3t/1 | 3000 | 3 | Basic |
| N08505020 | CPA/VFT ATEX 50-3 5t/2 | 5000 | 3 | Basic |
| 192069182 | CPA/VFT ATEX 60-3 6t/2 | 6000 | 3 | Basic |
| N08505021 | CPA/VFT ATEX 75-2 7.5t/3 | 7500 | 3 | Basic |
| N08505022 | CPA/VFT ATEX 100-3 10t/4 | 10000 | 3 | Basic |
Working air pressure: 4โ6 bar. All variants 109-day lead time. Trolley traversing speed adjustable via pressure regulator on the trolley air supply circuit.
Certified to ATEX Directive 2014/34/EU for use in Zone 1 (explosive gas atmospheres) and Zone 21 (explosive dust atmospheres). Supplied with EC Declaration of Conformity and CE marking. Basic ATEX category for surface industries.
Heavy-cycle production lines in chemical, petrochemical and pharmaceutical plants; offshore production decks; refineries and process facilities where powered lifting and powered lateral travel are both required from a single pendant operator in a Zone 1 or Zone 21 environment.
Warning:
Always isolate and exhaust the air supply before any maintenance. Verify beam end-stops are correctly installed before operation โ the powered trolley can travel rapidly and must not be allowed to overrun.
Inspect before each use โ focus on all load-bearing components, welds, hooks, safety latches, chain, rope and pendant controls. Thorough examination under LOLER 1998 is required at intervals not exceeding 6 months by a competent person. Replacement parts must be genuine manufacturer items to maintain certification. Records of all inspections must be retained for the life of the equipment.
VFT delivers powered trolley traversing from the same pendant that operates the hoist โ faster, less operator effort, and one-handed control for the full overhead crane function. Choose VFT for high-cycle production work where the load is moved laterally many times per shift. VTG is the better choice where lateral movement is occasional and a lower price point matters.
Yes. Traversing speed is controlled via a pressure regulator fitted on the trolley air supply circuit. Fine adjustment is possible to suit application requirements.
Yes โ VFT carries a price premium over the equivalent VTG variant, reflecting the air-drive mechanism on the trolley and the additional pendant circuit.
How it works
At WOLFF Onsite, weโve made renting equipment an effortless experience. Our streamlined process ensures you have fast access to quality equipment and heavy lifting accessories, tailored specifically to your project needs, exactly when you require them.
Currently, we operate on an enquiry basis. Simply reach out with your requirements, and our team will respond promptly with a customised quote to match your project scope and timeline.
From initial consultation to final handover and ongoing, we offer full support every step of the way, guaranteeing that your rental experience runs smoothly and efficiently.
Contact our team to discuss your project requirements and choose the right equipment.
Weโll provide a customised quote based on your needs and rental period.
Our experts deliver and set up the equipment at your site.
Receive full support throughout the rental period to ensure everything runs smoothly.
Part of WOLFFKRAN, trusted since 1854
From our depot to your site, every order is fully tracked and delivered on our own WOLFF Onsite vehicles or via trusted courier partners. Delivery costs are calculated based on your postcode and order size.
Pallet Delivery
Dispatched within 1โ2 working days, delivered next working day between 8amโ5pm, Monday to Friday. Delivery cost is based on the number of pallet spaces and your delivery zone.
Parcel Delivery
Smaller items like radio accessories and safety equipment ship via tracked courier at a flat rate. Deliveries between 8:30amโ5pm, Monday to Friday.
RENTAL Delivery / Collection
All rentals are delivered and collected by the WOLFF Onsite team. We'll confirm a delivery time that works for you and arrange collection within 3 working days of your hire end date. Deliveries and collections between 8amโ5pm, Monday to Friday, Saturday collections can be arranged if suitable.
Dispatch Times
Orders placed by 1pm are dispatched same day where possible. Some products carry a manufacturing lead time, this is always stated in the product description.
Need Help?
Call us: 01709 437 141
Email: hello@wolffonsite.co.uk Available 8:30am - 5pm Mon-Fri
We are happy to help with any delivery or product questions.
Part of WOLFFKRAN, trusted since 1854