Part of the Wolffkran Group โ€” German Engineering Since 1854 Wolffkran Group โ€” Since 1854
Fast UK Delivery on All Orders
London & Sheffield Offices
CE Marked & UKCA Certified Equipment CE Marked & UKCA Certified
Buy or Hire โ€” Flexible Equipment Solutions Buy or Hire Available
HIRE & BUY
Free Fast Delivery Available
Wolffkran Group Since 1854
30-Day Returns No questions asked
UK Stock Fast dispatch
UK Support Sheffield & London
Product Code: EX05

Yale CPA ATEX Pneumatic Chain Hoist with Geared Trolley VTG

  • โœ“ Heavy-duty pneumatic hoist with integrated geared beam trolley in one ATEX unit
  • โœ“ Six variants from 2000kg to 10000kg with standard 3m lift
  • โœ“ For demanding continuous-duty work in Zone 1 and Zone 21
  • โœ“ 100 percent duty rating with unlimited motor starts

Estimated delivery: Fri 26 Jun - Fri 3 Jul

UK Delivery

UK mainland delivery from FREE

Lead time: 14-21 days

Wolffkran Group Since 1854
30-Day Returns No questions asked
UK Stock Fast dispatch
UK Support Sheffield & London
  • Product Details

Yale CPA ATEX Pneumatic Chain Hoist with Geared Trolley

Model CPA/VTG ATEX | Pneumatic Chain Hoist with Manual Geared Trolley | Zone 1 & Zone 21 | 2000โ€“10000 kg

The Yale CPA/VTG ATEX combines a heavy-duty pneumatic chain hoist with an integrated manually-operated geared beam trolley, providing full lifting and lateral positioning capability from a single ATEX-certified unit. Available across six variants from 2000 kg to 10000 kg with a standard 3 m lift, it is engineered for the most demanding continuous-duty applications in Zone 1 and Zone 21 hazardous areas, with 100% duty rating and unlimited motor starts.

Key Features

  • Heavy-duty pneumatic hoisting โ€” 100% duty rating and unlimited motor starts for continuous industrial use up to 10000 kg.
  • Integrated geared trolley โ€” Hand-chain operated lateral traversing along the beam โ€” precise positioning without powered drive.
  • Three-component modular design โ€” Motor, gearbox and chain container as separate assemblies for fast, low-cost servicing.
  • Robust rotating piston motor โ€” Adjustable spring pressure brake holds the load secure even on air failure.
  • Oil-bath lubricated planetary gearbox โ€” Smooth running with low overall height โ€” minimum headroom impact.
  • Large dimension silencer โ€” Low noise emission for noise-sensitive industrial environments.
  • Pendant control with emergency stop โ€” Sensitive 2- or 4-button pendant for precise control under load.
  • Contamination resistant โ€” Insusceptible to humidity, aggressive media and atmospheric contamination.

Technical Specifications

Item # Description Capacity (kg) Lift (m) ATEX Class Lead Time (Days)
N08505011 CPA/VTG ATEX 20-8 2t/1 2000 3 Basic 109
N08505012 CPA/VTG ATEX 30-6 3t/1 3000 3 Basic 109
N08505014 CPA/VTG ATEX 50-3 5t/2 5000 3 Basic 109
192069177 CPA/VTG ATEX 60-3 6t/2 6000 3 Basic 109
N08505015 CPA/VTG ATEX 75-2 7.5t/3 7500 3 Basic 109
N08505016 CPA/VTG ATEX 100-3 10t/4 10000 3 Basic 109

Working air pressure: 4โ€“6 bar. All variants 109-day lead time. Geared trolley operates via hand chain at ground level โ€” no powered traversing.

ATEX Directive 2014/34/EU | Zone 1 & Zone 21 | Basic Classification

Certified to ATEX Directive 2014/34/EU for use in Zone 1 (explosive gas atmospheres) and Zone 21 (explosive dust atmospheres). Supplied with EC Declaration of Conformity and CE marking. Basic ATEX category for surface industries.

Suitable Applications

Heavy industrial lifting in chemical plants, petrochemical refineries, offshore production platforms, process facilities, paint and solvent handling areas, and any Zone 1 or Zone 21 location requiring powered hoisting combined with accurate manual lateral positioning from a single certified unit.

How to Use the CPA ATEX Geared Trolley

  1. Verify the air supply is clean, dry and regulated to 4โ€“6 bar before connection.
  2. Connect the air supply hose to the hoist inlet and check for leaks.
  3. Test the pendant controls for lift, lower and (where fitted) traverse operation.
  4. Attach the load hook centrally with the safety latch closed.
  5. Operate via the pendant using smooth control inputs.
  6. Isolate the air supply when the hoist is not in use.

Warning:
Always isolate and exhaust the air supply before any maintenance. Operate the geared trolley using the hand chain from ground level โ€” do not attempt to push the trolley along the beam under load.

Safety Information

  • Confirm the ATEX zone classification of the work area matches the equipment certification before use.
  • Never exceed the rated working load limit displayed on the equipment.
  • Never use equipment that shows visible damage, wear or deformation.
  • Keep all personnel clear of the lifted load at all times.
  • Do not modify, repair or substitute components other than as specified by the manufacturer.
  • Ensure the operator is trained, competent and authorised for ATEX lifting operations.

Inspection and Maintenance

Inspect before each use โ€” focus on all load-bearing components, welds, hooks, safety latches, chain, rope and pendant controls. Thorough examination under LOLER 1998 is required at intervals not exceeding 6 months by a competent person. Replacement parts must be genuine manufacturer items to maintain certification. Records of all inspections must be retained for the life of the equipment.

Frequently Asked Questions

Q: What is the difference between VTG (Geared) and VFT (Air Driven) trolley variants?

VTG = manual geared traversing โ€” the operator turns a hand chain to drive the trolley along the beam with mechanical advantage. VFT = powered air traversing โ€” pendant-controlled compressed-air drive moves the trolley automatically. VTG is the lower-cost option for occasional lateral positioning; VFT is preferred for high-cycle production work where powered movement is needed.

Q: Why is the lead time 109 days?

The CPA/VTG ATEX is a specialist build-to-order product manufactured to specific air supply and beam-flange requirements. The 109-day lead time reflects the engineering and testing involved in ATEX certification of the complete assembly.

Q: What working air pressure is needed?

4 to 6 bar at the hoist inlet, supplied through clean, dry, filtered air via a filter-regulator-lubricator unit.

Hire WOLFF Onsite

How it works

At WOLFF Onsite, weโ€™ve made renting equipment an effortless experience. Our streamlined process ensures you have fast access to quality equipment and heavy lifting accessories, tailored specifically to your project needs, exactly when you require them.

Currently, we operate on an enquiry basis. Simply reach out with your requirements, and our team will respond promptly with a customised quote to match your project scope and timeline.

From initial consultation to final handover and ongoing, we offer full support every step of the way, guaranteeing that your rental experience runs smoothly and efficiently.

Get in Touch

Contact our team to discuss your project requirements and choose the right equipment.

Tailored Quotation

Weโ€™ll provide a customised quote based on your needs and rental period.

Delivery & Setup

Our experts deliver and set up the equipment at your site.

Ongoing Support

Receive full support throughout the rental period to ensure everything runs smoothly.

Call Us

01709 437141

Email Us

hello@wolffonsite.co.uk

Monโ€“Fri: 8:30am โ€“ 5:00pm

Part of WOLFFKRAN, trusted since 1854

Delivery Information

From our depot to your site, every order is fully tracked and delivered on our own WOLFF Onsite vehicles or via trusted courier partners. Delivery costs are calculated based on your postcode and order size.

Pallet Delivery
Dispatched within 1โ€“2 working days, delivered next working day between 8amโ€“5pm, Monday to Friday. Delivery cost is based on the number of pallet spaces and your delivery zone.

Parcel Delivery
Smaller items like radio accessories and safety equipment ship via tracked courier at a flat rate. Deliveries between 8:30amโ€“5pm, Monday to Friday.

RENTAL Delivery / Collection
All rentals are delivered and collected by the WOLFF Onsite team. We'll confirm a delivery time that works for you and arrange collection within 3 working days of your hire end date. Deliveries and collections between 8amโ€“5pm, Monday to Friday, Saturday collections can be arranged if suitable.

Dispatch Times
Orders placed by 1pm are dispatched same day where possible. Some products carry a manufacturing lead time, this is always stated in the product description.

Need Help?
Call us: 01709 437 141
Email: hello@wolffonsite.co.uk Available 8:30am - 5pm Mon-Fri

We are happy to help with any delivery or product questions.

Part of WOLFFKRAN, trusted since 1854