Total Power Requirement: 850 kVA
Site Equipment: Tower Crane, 3 x Hoists, General Site Power (Lighting, CCTV, Turnstile)
CO₂ Savings: 42T over 4 weeks
Equivalent to: 18,188 commutes into Manchester prevented
WOLFF Onsite partnered with GMI on the Rochdale Road project to provide a reliable, low-noise power solution that would support site operations while meeting strict local restrictions. With neighbouring residential properties close to the site, minimising noise, emissions and disruption was a key priority throughout the project.
To support these requirements, the Enertainer Battery Energy Storage System was deployed to deliver efficient, scheduled power during both working hours and overnight silent periods.
Due to the site’s urban location, the project was subject to strict silent hours and local authority restrictions. Power was still required overnight to support essential systems such as:
Running a traditional diesel generator during these periods risked noise complaints, increased fuel consumption, and higher carbon emissions, all of which could negatively impact programme delivery and client satisfaction.
The Enertainer proved to be a highly effective solution. Using its intelligent scheduling system, the battery was programmed to:
Reach peak charge ahead of silent hours
Power lighting, CCTV and other essential systems silently overnight
Automatically recharge during permitted working hours
This approach significantly reduced reliance on the charging generator, while ensuring uninterrupted power supply throughout the day and night, without disturbing local residents.
The results delivered strong operational, financial and environmental benefits:
Generator runtime reduced to approximately 25% of initial expectations
50% cost saving across the project through reduced diesel usage and associated expenses
70% reduction in carbon emissions
Zero noise complaints during silent hours
The Enertainer played a key role in maintaining positive client and stakeholder feedback, with GMI reporting excellent performance and overall satisfaction with the solution.
Part of WOLFFKRAN, trusted since 1854
From our depot to your site, every order is fully tracked and delivered on our own WOLFF Onsite vehicles or via trusted courier partners. Delivery costs are calculated based on your postcode and order size.
Pallet Delivery
Dispatched within 1–2 working days, delivered next working day between 8am–5pm, Monday to Friday. Delivery cost is based on the number of pallet spaces and your delivery zone.
Parcel Delivery
Smaller items like radio accessories and safety equipment ship via tracked courier at a flat rate. Deliveries between 8:30am–5pm, Monday to Friday.
RENTAL Delivery / Collection
All rentals are delivered and collected by the WOLFF Onsite team. We'll confirm a delivery time that works for you and arrange collection within 3 working days of your hire end date. Deliveries and collections between 8am–5pm, Monday to Friday, Saturday collections can be arranged if suitable.
Dispatch Times
Orders placed by 1pm are dispatched same day where possible. Some products carry a manufacturing lead time, this is always stated in the product description.
Need Help?
Call us: 01709 437 141
Email: hello@wolffonsite.co.uk Available 8:30am - 5pm Mon-Fri
We are happy to help with any delivery or product questions.
Part of WOLFFKRAN, trusted since 1854