Skip to content
WolffKran Group · Est. 1854Fast UK delivery & export optionsUKCA & CE certified equipmentCredit accounts for business01709 437141

Plastic Mortar Container

SKU IPMC-EP
Inc VAT
£216.79
Ex VAT
£180.66

In stock - ready to dispatch

Estimated delivery: 1–3 daysDelivery: ✓ FREE
£216.79 (£180.66 ex. VAT)
✓ Secure checkout ✓ BACS & Proforma ✓ Credit account

Key features

  • ✓ Enclosed fork pockets for stability
  • ✓ Stackable, ribbed body
  • ✓ 250 litre capacity; UK manufactured by Invicta
Why WOLFF Onsite
170+ yrs

Part of Wolffkran heritage since 1854 — we trust the kit we sell

Price match

Seen it cheaper? Send us the quote and we'll try to match it

30 days

Returns on unused items in original packaging — full refund, no fuss

UK support

Lifting-gear specialists in Sheffield & London — phone & email

DownloadsDatasheetPDF

The Invicta Plastic Mortar Container (Model IPMC-EP-250LTR) has been designed to aid the safe transportation of mortar around construction sites. The enclosed fork pockets provide greater stability and safety, preventing the container from tipping off the forks during transit and whilst lifting at height. Manufactured in Leeds by Invicta Forks & Attachments.

Key Features

  • Enclosed fork pockets — prevents tipping and improves stability during transit and at height
  • Ribbed body construction — added structural strength for loaded transport
  • Easily stackable — efficient storage when not in use
  • Durable high-density polyethylene — long-lasting material resistant to mortar and cement

Technical Specifications

Model L×W×D (mm) Capacity
IPMC-EP-250LTR 1120 × 860 × 635 250 Litre
UK Manufactured | LOLER Compliant

This product is designed and manufactured in the UK by Invicta Forks & Attachments, the UK's largest mechanical forklift attachment manufacturer, based in Leeds. Where applicable, this product is supplied with a test certificate and EC Declaration of Conformity. LOLER 1998 thorough examinations are required every 6 months by a competent person after initial certification.

Inspection and Maintenance

Inspect regularly with particular attention to all weld points, lifting eyes, pivot points and any signs of deformation or corrosion. Certified for six months from manufacture — thorough examination under LOLER 1998 required every 6 months.

More in Site Trolleys & Carts

View all →