Skip to content
WolffKran Group · Est. 1854Fast UK delivery & export optionsPrice match promiseCredit accounts for business01709 437141
Prices
Light Duty Static Cylinder Floor Stand
1 / 5

Light Duty Static Cylinder Floor Stand

Part no. WOS-FA-1083
£148.50£123.75Inc VATEx VAT
£123.75 ex VAT£148.50 inc VAT ·
Option: choose one

About this item

  • 1 or 2 cylinders
  • Two diameter ranges
  • Estimated lead time: 40 working days from order

Product description

Light duty static floor stands hold one or two gas cylinders upright with retaining chains, so they cannot tip or roll. Choose stands for cylinders of 100 to 180 mm or 140 to 270 mm diameter. Part of our gas cage storage range.

Steel with a powder-coated finish for indoor or outdoor use.

Key Features
  • 1 or 2 cylinders
  • Two diameter ranges
  • Integral retaining chains
  • Powder-coated steel
  • Indoor or outdoor use

Specifications

Choose a size above to see its specifications.

Compare all 4 sizes
Part no. Option Cylinder Diameter (mm) No. Cylinders Width (mm) Depth (mm) Height (mm) Weight (kg)
WOS-FA-1083-01 1 x Cylinder (100-180 dia) 100 - 180mm 1 255 255 1005 7
WOS-FA-1083-02 2 x Cylinder (100-180 dia) 100 - 180mm 2 500 255 1005 10
WOS-FA-1083-03 1 x Cylinder (140-270 dia) 140 - 270mm 1 340 345 1005 9
WOS-FA-1083-04 2 x Cylinder (140-270 dia) 140 - 270mm 2 660 345 1005 14

Dimensions are in mm and weights in kg. The datasheet can be downloaded from this page.

What's Included
  • 1 x floor stand

You may also need the gas bottle storage unit.

Documents (1)

View on this page or download.

PDFDatasheet
PDF document

Using and looking after it

Always read the manufacturer’s instructions before use. See the documents

Typical Applications
  • Workshops
  • Warehouses
  • Outdoor cylinder stores

Buying guide

Design & Construction

Store cylinders upright, secured against falling, in a well-ventilated area away from heat and ignition sources, as set out in the BCGA codes of practice.

Which Option Do I Need?

For more cylinders or heavier use, see the heavy duty floor racks.

Questions and answers

Q: How long is the lead time?

A: Estimated 40 working days from order, plus delivery. It is made to order, and we confirm the date when you order.

Have a question about this product?Ask a question

More in Gas Cage Storage

View all →