Ready for dispatch
The 1 m strut is the mid-length spanning section in the Modulift MOD 24 system. Combined with 0.5 m and 2 m struts, it lets one set build any span from 1 m to 8 m in half-metre steps.
It is sold as an individual component, not a complete beam; a beam also needs two MOD 24 end units and other parts from our Modulift MOD 24 range.
Working load limits depend on the assembled span and the sling-to-vertical angle. Check the Load v Span table in the Modulift user instructions for your configuration.
View on this page or download.
A: Two end units, two drop links and the struts that make up your span. Nuts and bolts come as standard with a complete beam.
A: No. Flange sizes, bolt patterns and ratings differ between series. Use MOD 24 parts throughout.
A: It depends on the assembled span and sling angle. Check the Load v Span table in the user instructions, or send us the span and load and we will check it.
Loading your basket…
Delivery calculated at checkout.
CheckoutCard, Apple Pay, Pay by bank, proforma or 30-day account

Modulift is a British designer and manufacturer of modular spreader beams, lifting beams and spreader frames. Sue Spencer founded the company in 2002, and it is based in Poole, Dorset. Its range covers capacities up to 600 tonnes.
See all Modulift products →