Ready for dispatch
This is a 1 m strut for the Modulift MOD 50 modular spreader beam system, sold as an individual component. Struts are the spanning members that bolt between the two end units, and different lengths combine to give the span a lift needs.
At one metre it is the most common make-up length, used to step a span up or down in whole metres.
The MOD 50 series is rated 50 t at 8 m span (30° sling to vertical), with a maximum span of 13 m at reduced capacity. Other lengths are in our Modulift MOD 50 range.
Each beam also needs two MOD 50 end units and two drop links.
View on this page or download.
Always read the manufacturer’s instructions before use. See the documents
A complete MOD 50 beam needs two end units, two drop links and the struts that make up the span, with nuts and bolts supplied as standard. Add strut lengths together to reach the span you need, and check the Load v Span table in the Modulift User Instructions for the capacity at that span and sling angle.
Only use MOD 50 struts with MOD 50 end units and drop links. We can work out the strut combination for your lift if you send us the span and load.
A: No. A beam needs two end units, two drop links and the struts for the span.
A: No. Use MOD 50 struts with MOD 50 end units and drop links only.
A: Work out the span, then combine strut lengths to reach it. The Load v Span table in the User Instructions gives the capacity at each span. We can specify the combination for you.
A: Manufacturer certification is supplied with the component.
Loading your basket…
Delivery calculated at checkout.
CheckoutCard, Apple Pay, Pay by bank, proforma or 30-day account

Modulift is a British designer and manufacturer of modular spreader beams, lifting beams and spreader frames. Sue Spencer founded the company in 2002, and it is based in Poole, Dorset. Its range covers capacities up to 600 tonnes.
See all Modulift products →