Skip to content
WolffKran Group · Est. 1854Fast UK delivery & export optionsUKCA & CE certified equipmentCredit accounts for business01709 437141
Prices
Modulift MOD6 3m

Modulift MOD6 3m

Weekly hire
From £138.00/wkFrom £115.00/wkInc VATEx VAT
From £115.00/wk ex VATFrom £138.00/wk inc VAT ·
Hire cannot start on days highlighted with a dotted border.
Total: £ ()
Excluding any selected add-ons
Hire return within days

About this item

  • Modular six-tonne spreader beam in 3.0m configuration
  • Bolt-together end units, drop links and struts
  • 6T at 30 degrees STV (5T at 45 degrees); components reusable across the MOD6 range

Product description

The Modulift MOD6 3m is a six-tonne modular spreader beam supplied built to a 3.0 m span.

It is rated 6 t with top slings at 30° from vertical, or 5 t at 45°, and the beam components weigh 28.8 kg (32.4 kg with the four specified shackles), so it is easy to handle and store.

The struts unbolt and can be re-used at other spans with additional MOD 6 struts.

Key Features
  • 3.0 m span, 6 t at 30° STV, 5 t at 45° STV
  • 28.8 kg (32.4 kg with the four specified shackles)
  • Bolt-together end units, drop links and struts
  • 4 x M10 Grade 8.8 bolts per flange at 60 Nm
  • DNV type approved
Design & Construction

Top slings run from the hook to the end units and the load hangs from the drop links. STV (sling-to-vertical) is the top sling angle: steeper slings (30°) give the full 6 t, flatter (45°) reduce it to 5 t but need less headroom.

Minimum top sling length is 3.0 m at 30° and 2.1 m at 45°.

Choosing the Right Size

Other spans can be built from individual MOD 6 struts: 0.1 m, 0.2 m, 0.3 m, 0.6 m and 1 m. Check the Modulift Load v Span table for the rating at your span.

What's Included
  • Modulift MOD6 end units, drop links and struts for a 3.0 m span
  • M10 Grade 8.8 bolts, nuts and washers

You may also need: 4.75 t top and 3.25 t lower shackles (the sizes specified for MOD 6 components) and top slings.

Specifications

ModelModulift MOD6
Span3.0 m
WLL at 30° STV6 t
WLL at 45° STV5 t
Min. top sling at 30°3.0 m
Min. top sling at 45°2.1 m
Weight28.8 kg beam components; 32.4 kg with 2 x 4.75 t and 2 x 3.25 t shackles
Bolts4 x M10 Grade 8.8 per flange, 60 Nm
ApprovalDNV type approved

Documents (2)

View on this page or download.

PDFModulift MOD 6 User Instructions
PDF document
PDFModulift Inspection Guide
PDF document

Using and looking after it

Always read the manufacturer’s instructions before use. See the documents

Typical Applications
  • Two-point lifts where slings must clear the load
  • Lifting long or flexible items up to 6 t
  • Low-headroom lifts at 45° STV
  • Workshops and fabrication shops

Questions and answers

Q: Can I change the span?

A: Yes. Unbolt and add or remove MOD 6 struts, then check the rating for the new span.

Q: Are shackles included?

A: Shackles are not listed as included. MOD 6 components specify 4.75 t top and 3.25 t lower shackles.

Q: What is STV?

A: Sling-to-vertical: the angle of the top slings. Steeper slings give a higher rating.

Have a question about this product?Ask a question

More in Modulift MOD 6

View all →