The Invicta Crane Slung Boat Skip (Model IBS) includes a specific self-dumping system ideal for moving goods and building materials on site such as cement and aggregates — lifting and emptying automatically without manual intervention, eliminating risk to personnel. The integral locking bale arm ensures safe transit while the reinforced body sides and leading edge deliver long-term durability in demanding construction environments. Manufactured in Leeds by Invicta Forks & Attachments.
Key Features
- Self-dumping system — lifts and empties automatically without manual intervention
- Integral locking bale arm — secures the skip during transit with side bolt locking
- Low loading height — reduces manual handling effort when filling the skip
- Reinforced body sides and rear — built for durability in harsh construction environments
- Reinforced leading edge — withstands repeated impact during dumping operations
- Bail arm rest — neat storage when not in use
- Painted bright orange for safety — high-visibility finish for on-site safety compliance
Technical Specifications
| Model |
Nominal Capacity (L) |
Capacity (kg) |
Body L×W×H (mm) |
Overall Height (mm) |
Weight (kg) |
| IBS-500 |
500 |
1000 |
1280 × 980 × 600 |
1080 |
100 |
| IBS-1000 |
1000 |
2000 |
1680 × 1280 × 860 |
1360 |
230 |
UK Manufactured | LOLER Compliant
This product is designed and manufactured in the UK by Invicta Forks & Attachments, the UK's largest mechanical forklift attachment manufacturer, based in Leeds. Where applicable, this product is supplied with a test certificate and EC Declaration of Conformity. LOLER 1998 thorough examinations are required every 6 months by a competent person after initial certification.
Suitable Applications
Ideal for construction sites where concrete, mortar, aggregate and general building waste needs to be transported and tipped by overhead crane. The automatic dumping mechanism makes the IBS particularly efficient for high-volume material movement.
Waste skips tip. Where a pour must be placed accurately through a controlled gate, a concrete skip is the right tool. Check the loaded weight against the crane chart rather than sizing on volume.
Inspection and Maintenance
Inspect regularly with particular attention to all weld points, lifting eyes, pivot points and any signs of deformation or corrosion. Certified for six months from manufacture — thorough examination under LOLER 1998 required every 6 months.