Skip to content
WolffKran Group · Est. 1854Fast UK delivery & export optionsPrice match promiseCredit accounts for business01709 437141
Prices
Crane Slung Boat Skip
1 / 7

Crane Slung Boat Skip

Part no. IBS-500
£1,336.09£1,113.41Inc VATEx VAT
£1,113.41 ex VAT£1,336.09 inc VAT ·
Capacity: 500 Litre

About this item

  • Self-dumping boat skip for moving building materials on site
  • Automatic bale arm locking
  • 500-1000 litre capacity; UK manufactured by Invicta

Product description

The Invicta IBS Crane Slung Boat Skip moves and tips building materials and waste by overhead crane. Its self-dumping system lifts and empties the skip automatically, so no one has to reach in and release a catch under a suspended load.

An integral locking bale arm holds it steady in transit. Choose 500 or 1,000 litres (1,000 or 2,000 kg). Made in Leeds by Invicta Forks & Attachments.

Key Features
  • Self-dumping, empties without manual handling
  • Automatic bale arm locking with side bolt
  • Low loading height: 380 to 400 mm lip
  • Reinforced sides, rear and leading edge
  • Bale arm rest for tidy storage

Specifications

Choose a size above to see its specifications.

Compare all 2 sizes
Model Capacity SWL Body (L x W x H) Overall height Lip height Weight
IBS-500 500 L 1,000 kg 1,280 x 980 x 600 mm 1,080 mm 380 mm 100 kg
IBS-1000 1,000 L 2,000 kg 1,680 x 1,280 x 860 mm 1,360 mm 400 mm 230 kg
Manufacturer Invicta Forks & Attachments, Leeds, UK
Operation Self-dumping, automatic bale arm locking
Lifting Crane, via bale arm
Finish Orange paint
What's Included
  • Invicta IBS boat skip in your chosen size, with locking bale arm
  • Test certificate and EC Declaration of Conformity where applicable

You may also need: the Eichinger 1045FA Boat Skip for sizes up to 4,000 L.

Documents (1)

View on this page or download.

PDFIBS Specification
PDF document

Using and looking after it

Always read the manufacturer’s instructions before use. See the documents

Typical Applications
  • Cement, mortar and aggregates by crane
  • General building waste from upper floors
  • High-volume material movement on busy sites

Buying guide

Design & Construction

A boat skip has sloping ends, so the load slides out when it tips. On the IBS the bale arm (the hinged lifting frame) locks the body in its carrying position with a side bolt while it travels.

At the tip point the self-dumping system releases the body and it empties under its own weight, then resets for the next load.

The bale arm folds back onto a rest while the skip is being filled, keeping the loading height low.

Choosing the Right Size

Size on weight, not volume. A full 500 L of wet concrete exceeds the 1,000 kg SWL of the smaller skip, so part-fill with dense material.

  • IBS-500, 1,000 kg: 100 kg skip; mortar, aggregates and lighter cranes.
  • IBS-1000, 2,000 kg: 230 kg skip; bulk muck and building waste on bigger cranes.

Questions and answers

Q: Can I fill it with concrete?

A: Yes, but not to the brim in the 500 L size: a full load of wet concrete is heavier than its 1,000 kg SWL. For placing concrete accurately, use a concrete skip with a gate.

Q: Does anyone need to release it by hand?

A: No. The self-dumping system lifts and empties the skip automatically.

Have a question about this product?Ask a question

More in Waste Skips

View all →