Skip to content
WolffKran Group · Est. 1854Fast UK delivery & export optionsPrice match promiseCredit accounts for business01709 437141
Prices
Modulift MOD 70H - End Unit
1 / 2

Modulift CMOD 70 - Corner Unit V2 - EACH

Part no. MODU-0070-CMOD-V2
£2,533.49£2,111.24Inc VATEx VAT
£2,111.24 ex VAT£2,533.49 inc VAT ·

About this item

  • Genuine Modulift CMOD 70 corner unit, priced each
  • Frame rated up to 80t, spans 1m x 1m to 12m x 12m
  • Builds MOD frames for four-point lifts

Product description

The Modulift CMOD 70 corner unit V2 lets MOD 70 struts be built into a square or rectangular four-point lifting frame. It is sold individually, and a frame needs four corner units plus struts for each side.

A CMOD 70 frame is rated to a maximum of 80 t WLL at 30° sling to vertical (60 t at 45°), with each corner unit rated 20 t.

Frames can be built from 1 m x 1 m to 12 m x 12 m. Each unit weighs 145 kg and has 0.5 m legs.

It is part of our MOD 70 range.

Key Features
  • Builds MOD 70 struts into a four-point frame
  • Frame rated up to 80 t at 30° STV (60 t at 45°); 20 t per corner unit
  • Frame sizes 1 m x 1 m to 12 m x 12 m, up to 5 struts per side
  • 145 kg each, with 0.5 m legs
  • Genuine Modulift component with certification

Specifications

Part number0070/CMOD-V2
SeriesModulift MOD 70
Component typeCorner unit (sold each)
Frame rated capacity80 t maximum WLL at 30° STV (60 t at 45°)
Corner unit rating20 t each
Frame span range1 m x 1 m to 12 m x 12 m
Max. struts per side5
Corner unit weight145 kg each (0.5 m legs)
Heaviest single component in the series240 kg
What's Included
  • 1 x Modulift CMOD 70 corner unit V2
  • Manufacturer certification

Build each side from MOD 70 struts.

Documents (2)

View on this page or download.

PDFModulift CMOD 70 User Instructions
PDF document
PDFModulift CMOD Inspection Guide
PDF document

Using and looking after it

Always read the manufacturer’s instructions before use. See the documents

Typical Applications
  • Four-point lifts of skids, tanks and modules
  • Loads that need support at the corners
  • Plant and machinery installation
  • Converting an existing MOD 70 beam set into a frame

Buying guide

Choosing the Right Size

Order four corner units for a frame, plus the struts for each side, up to 5 struts per side. The frame has its own Load v Span table; check the capacity for your frame size rather than using the beam rating.

Questions and answers

Q: How many corner units does a frame need?

A: Four, plus the struts for each side.

Q: Does a frame have the same capacity as a beam?

A: No. The CMOD 70 frame is rated up to 80 t at 30° sling to vertical; check the frame Load v Span table for your size.

Q: Can I use the same struts for a frame and a beam?

A: Yes. MOD 70 struts are used for both.

Have a question about this product?Ask a question

More in Modulift MOD 70

View all →