Ready for dispatch
The Modulift MOD 70 end unit sits at each end of a MOD 70 spreader beam. Struts bolt to one face and the drop link to the other, so it carries the sling load into the beam and sets the beam's geometry.
It weighs 56 kg and is rated 35 t WLL each (70 t per pair).
Two are needed per beam. The Modulift MOD 70 series is rated 70 t at 10.5 m span (30° sling to vertical), uses matched shackles (55 t top, 35 t lower) and reaches 14 m at reduced capacity.
Each end unit takes one of the MOD 70 drop links.
View on this page or download.
Always read the manufacturer’s instructions before use. See the documents
A beam needs two end units, two drop links and the struts for the span. Use the matched shackle sizes for the series; they are part of the certified geometry.
A: Two, one at each end.
A: Use the matched sizes for the series, 55 t top, 35 t lower.
A: No. Use MOD 70 end units with MOD 70 struts and drop links.
Loading your basket…
Delivery calculated at checkout.
CheckoutCard, Apple Pay, Pay by bank, proforma or 30-day account

Modulift is a British designer and manufacturer of modular spreader beams, lifting beams and spreader frames. Sue Spencer founded the company in 2002, and it is based in Poole, Dorset. Its range covers capacities up to 600 tonnes.
See all Modulift products →