Ready for dispatch
The Modulift MOD 250 0.5 m strut (0250/0.50) is a spanning member for the MOD 250 modular spreader beam.
It is the shortest strut, for fine-tuning the span in 0.5 m steps. Struts bolt between the two end units, and lengths combine to build any span from 2 m to 21 m in 0.5 m steps.
The struts are common to the MOD 250/250, 250/300 and 250/400 variants, rated 250 t at 14 m, 300 t at 13 m and 400 t at 11 m span respectively (30° STV).
This strut weighs 192 kg. It is a single component, not a complete beam.
Longer lengths such as the 1.0 m strut are in our Modulift range.
MOD 250 components (Modulift user instructions)
| Component | WLL | Weight |
|---|---|---|
| End unit, MOD 250/250 / 250/300 / 250/400 | 125 t / 150 t / 200 t | 365 kg each |
| Drop link, MOD 250/250 / 250/300 / 250/400 | 125 t / 150 t / 200 t | 90 kg each |
| Strut 0.5 / 1.0 / 2.0 / 3.0 / 6.0 m | Common to all three variants | 192 / 255 / 375 / 495 / 860 kg |
A pair of end units on their own gives a 2 m span. Add struts to reach the span you need, using no more than five. Put longer struts in the centre of the assembly. The recommended configuration for each span is in the Load v Span table.
View on this page or download.
Always read the manufacturer’s instructions before use. See the documents
A: The rating belongs to the assembled beam. It depends on the variant of end units and drop links, the span and the sling angle.
A: In the centre of the assembly, as the instructions require.
A: Yes. Tell us the load, span and sling angle.
Loading your basket…
Delivery calculated at checkout.
CheckoutCard, Apple Pay, Pay by bank, proforma or 30-day account

Modulift is a British designer and manufacturer of modular spreader beams, lifting beams and spreader frames. Sue Spencer founded the company in 2002, and it is based in Poole, Dorset. Its range covers capacities up to 600 tonnes.
See all Modulift products →