Skip to content
WolffKran Group · Est. 1854Fast UK delivery & export optionsPrice match promiseCredit accounts for business01709 437141
Prices
Modulift MOD 250 - 6.0m Strut
1 / 2

Modulift MOD 250 - 2.0m Strut

Part no. MODU-0250-2.00
£3,732.77£3,110.64Inc VATEx VAT
£3,110.64 ex VAT£3,732.77 inc VAT ·

About this item

  • 2m strut for the Modulift MOD 250 spreader beam system
  • Series rated 250t at 14m to 400t at 11m span (30° STV)
  • Combine struts to build the span you need

Product description

The Modulift MOD 250 2.0 m strut (0250/2.00) is a spanning member for the MOD 250 modular spreader beam.

It is a mid-length strut for building medium spans. Struts bolt between the two end units, and lengths combine to build any span from 2 m to 21 m in 0.5 m steps.

The struts are common to the MOD 250/250, 250/300 and 250/400 variants, rated 250 t at 14 m, 300 t at 13 m and 400 t at 11 m span respectively (30° STV).

This strut weighs 375 kg. It is a single component, not a complete beam.

For longer spans, see the 3.0 m strut or our full Modulift range.

Key Features
  • 2.0 m strut, 375 kg
  • Fits MOD 250/250, 250/300 and 250/400 end units
  • Bolted connections: M24 x 80 Grade 8.8, 10 per connection, 250 Nm
  • Up to 5 struts per assembly
  • Engraved stainless steel ID plate
  • Supplied with Modulift certification

Specifications

Part number0250/2.00
SeriesModulift MOD 250
Strut length2.0 m
Weight375 kg
Compatible variantsMOD 250/250, 250/300, 250/400
Beam ratings250 t at 14 m / 300 t at 13 m / 400 t at 11 m span (30° STV)
Span range2 m to 21 m in 0.5 m increments
Connection boltsM24 x 80 Grade 8.8, 10 per connection, 250 Nm
Maximum struts per assembly5
Weight at maximum span4,895 kg (Modulift figure for the heaviest MOD 250 set in the recommended configuration)

MOD 250 components (Modulift user instructions)

Component WLL Weight
End unit, MOD 250/250 / 250/300 / 250/400 125 t / 150 t / 200 t 365 kg each
Drop link, MOD 250/250 / 250/300 / 250/400 125 t / 150 t / 200 t 90 kg each
Strut 0.5 / 1.0 / 2.0 / 3.0 / 6.0 m Common to all three variants 192 / 255 / 375 / 495 / 860 kg
Building the Span

A pair of end units on their own gives a 2 m span. Add struts to reach the span you need, using no more than five. Put longer struts in the centre of the assembly. The recommended configuration for each span is in the Load v Span table.

What's Included
  • 1 x Modulift MOD 250 2.0 m strut

Documents (4)

View on this page or download.

PDFModulift MOD 250/250 User Instructions
PDF document
PDFModulift MOD 250/300 User Instructions
PDF document
PDFModulift MOD 250/400 User Instructions
PDF document
PDFModulift Inspection Guide
PDF document

Using and looking after it

Always read the manufacturer’s instructions before use. See the documents

Typical Applications
  • Heavy plant and module lifts
  • Offshore and marine lifts
  • Bridge and civil engineering lifts

Questions and answers

Q: Does the strut have its own WLL?

A: The rating belongs to the assembled beam. It depends on the variant of end units and drop links, the span and the sling angle.

Q: Where do longer struts go?

A: In the centre of the assembly, as the instructions require.

Q: Can you specify the assembly?

A: Yes. Tell us the load, span and sling angle.

Have a question about this product?Ask a question

More in Modulift

View all →