Skip to content
WolffKran Group · Est. 1854Fast UK delivery & export optionsPrice match promiseCredit accounts for business01709 437141
Prices
Multi-Sec Multi 110 Drop Link

Multi-Sec Multi 110 End Unit (0.75m)

Part no. MS-EU-110
£1,492.15£1,243.46Inc VATEx VAT
£1,243.46 ex VAT£1,492.15 inc VAT ·

About this item

  • 0.75m end unit for the Multi 110 spreader beam system, rated to 110 tonnes
  • Carries the top shackle and the drop link; two per assembly, 148kg each, bolts supplied
  • DNV Type Approved to DNV-ST-0378, UK made and 100% proof tested before despatch

Product description

The Multi-Sec Multi 110 End Unit is one end of a Multi 110 modular spreader beam, rated to 110 tonnes.

Two are needed per beam, one at each end; each carries the top shackle to the crane rigging and the drop link that takes the bottom shackle. It is 0.75 m long and weighs 148 kg.

Key Features
  • Part of the 110 t Multi 110 system
  • Carries the top shackle and drop link
  • Two per spreader beam
  • 0.75 m long, 148 kg, bolts supplied
  • DNV Type Approved to DNV-ST-0378

Specifications

SystemMulti 110
System rating110 t
Length0.75 m
Weight148 kg
Quantity per beam2
Top shackle (per IFU)85 t standard bow
ApprovalsDNV Type Approved to DNV-ST-0378; designed, made and tested in the UK to DNV-ST-0378, BS EN 13155, BS EN 1993-1-1 (Eurocode 3) and the Machinery Directive; ISO 9001:2015, BS EN 1090-2 Execution Class 3; 100% proof tested
What's Included
  • End unit
  • Connection bolts

Shackles specified for Multi 110 (Multisec): top 85 t standard bow; bottom 55 t standard bow.

Other Multi 110 components: two Multi 110 drop links hang below the end units, and Multi 110 struts set the span.

Using and looking after it

Always read the manufacturer’s instructions before use.

Typical Applications
  • Offshore and platform lifts
  • Precast and steel erection
  • Plant, modules and vessels
  • Contract lifts needing a set span

Buying guide

Design & Construction

Multi-Sec is a modular spreader beam and lifting frame system. A spreader beam is built from two end units with struts bolted between them; the end units carry the top shackles (to the crane slings) and the drop links, which hang below and take the bottom shackles to the load.

Adding struts lengthens the beam. Swapping the end units for four corner units turns the same struts into a four-point lifting frame (Multi F).

DNV Type Approval to DNV-ST-0378 means the design is approved to the DNV standard for offshore and platform lifting appliances. Components are matched within one capacity system and cannot be mixed between systems.

Questions and answers

Q: Can I use it with another Multi-Sec system?

A: No. Components are matched within one capacity system and cannot be mixed.

Have a question about this product?Ask a question

More in Multi-Sec Components

View all →