Total Power Requirement: 460 kVAÂ
Savings: 276T of CO2 over 88 weeks
Equivalent to: 120,044 commutes into Shrewsbury
WOLFF Onsite is proud to have supported VINCI Building in delivering a cleaner, quieter and more efficient power solution at the Royal Shrewsbury and Telford Hospital (SaTH) development. With sustainability high on the agenda, the Enertainer battery energy storage system (BESS) was chosen to power two tower cranes with a total of 460kVA power requirement.
As the project team began shaping the delivery strategy alongside key supply chain partners, the idea of integrating an Enertainer was raised. On a hospital site, noise and emissions are particularly sensitive issues. The team needed a power solution that could offer strong environmental performance without compromising reliability, and that’s exactly what the Enertainer delivered.
After conducting in-depth research and visiting an Enertainer in action, VINCI Building carried out a cost-benefit analysis. The results were clear, not only did the Enertainer offer significant fuel and cost savings, it also brought the added benefit of lower noise levels and fewer fuel deliveries.
While the site was being prepared an Enertainer provided by WOLFF Onsite, was paired with a small temporary generator before later moving onto a grid connection. Thanks to the Enernet platform, remote monitoring and real-time performance insights allowed the site team to track usage, receive notifications, and observe live status updates. Even over the Christmas period when aviation lighting remained powered seamlessly.
Since being deployed, the Enertainer has proven to be a clean, quiet, and highly reliable solution. Its ability to manage peak loads and support two tower cranes has reduced operational complexity while helping VINCI Building meet both financial and environmental targets.
WOLFF Onsite is proud to have contributed to a project that not only supports essential healthcare infrastructure but also demonstrates the real-world impact of sustainable construction solutions. We look forward to continuing to support VINCI Building and the wider industry in building smarter, greener sites.
"All in all, it is a very good piece of kit...clean, reliable and cost effective. The Enertainer clearly gave us the financial savings on the fuel, the benefits of noise and less fuel deliveries."
Simon Baseley - Senior QS - VINCI Building UK
Part of WOLFFKRAN, trusted since 1854
From our depot to your site, every order is fully tracked and delivered on our own WOLFF Onsite vehicles or via trusted courier partners. Delivery costs are calculated based on your postcode and order size.
Pallet Delivery
Dispatched within 1–2 working days, delivered next working day between 8am–5pm, Monday to Friday. Delivery cost is based on the number of pallet spaces and your delivery zone.
Parcel Delivery
Smaller items like radio accessories and safety equipment ship via tracked courier at a flat rate. Deliveries between 8:30am–5pm, Monday to Friday.
RENTAL Delivery / Collection
All rentals are delivered and collected by the WOLFF Onsite team. We'll confirm a delivery time that works for you and arrange collection within 3 working days of your hire end date. Deliveries and collections between 8am–5pm, Monday to Friday, Saturday collections can be arranged if suitable.
Dispatch Times
Orders placed by 1pm are dispatched same day where possible. Some products carry a manufacturing lead time, this is always stated in the product description.
Need Help?
Call us: 01709 437 141
Email: hello@wolffonsite.co.uk Available 8:30am - 5pm Mon-Fri
We are happy to help with any delivery or product questions.
Part of WOLFFKRAN, trusted since 1854