Grid-Powered Battery Energy Storage Eliminates Diesel at McGoff Site

  • Location: Manchester
  • Customer: McGoff Construction

7 DAY SAVINGS

Fuel Savings

Diesel consumption
reduced by

0 L
Cost Savings

Total cost savings
on diesel

£ 0
CO2 Savings

Total CO2e
emissions cut by

0 T

Total Power Requirement: 1120 kVA 
Alternative Solution: 4 x Diesel Generators (500 kVA, 300kVA, 160 kVA, 160 kVA)

Project Overview

McGoff Construction faced a significant power challenge on their Manchester site. Their original set up involved four diesel generators to operate critical lifting equipment, a setup with highs costs and heavy environmental implications.

WOLFF Onsite were brought in and advised that a low voltage temporary building supply would soon become available. With time of the essence, the project needed to be hook-ready and fully operational as quickly as possible to meet programme milestones.

The Solution

WOLFF Onsite provided the Enertainer — a Battery Energy Storage System (BESS) — as a clean, scalable alternative to diesel power. Drawing only 30A from the 90A supply, the Enertainer powered the full lifting setup seamlessly.

Key advantages included:

  • Remote monitoring with zero on-site management
  • No diesel required, dramatically cutting emissions and noise
  • Reduced traffic and delivery disruption, thanks to fewer fuel deliveries and less gate congestion
  • Mitigated risk, ensuring cranes were operational without waiting for grid upgrades

 

The Outcome

Over the 56-week period it’s been on hire, the Enertainer delivered outstanding environmental and operational benefits:

  • 753 tonnes of CO2e saved
  • Equivalent to 327,519 commutes into Manchester avoided
  • Maintained full crane and hoist operations using just a fraction of the expected power
  • Supported on-time, on-budget programme delivery

“Without asking WOLFF Onsite for help, we wouldn't have been in a position where we were able to have a positive impact on the environment and a positive impact on the program”

Darrell Cullen - Senior Project Manager - McGoff Construction

Wolff On Site Enertainer 2 scaled e1729003631303

Call Us

01709 437141

Email Us

[email protected]

Mon–Fri: 8:30am – 5:00pm

Part of WOLFFKRAN, trusted since 1854

Delivery Information

From our depot to your site, every order is fully tracked and delivered on our own WOLFF Onsite vehicles or via trusted courier partners. Delivery costs are calculated based on your postcode and order size.

Pallet Delivery
Dispatched within 1–2 working days, delivered next working day between 8am–5pm, Monday to Friday. Delivery cost is based on the number of pallet spaces and your delivery zone.

Parcel Delivery
Smaller items like radio accessories and safety equipment ship via tracked courier at a flat rate. Deliveries between 8:30am–5pm, Monday to Friday.

RENTAL Delivery / Collection
All rentals are delivered and collected by the WOLFF Onsite team. We'll confirm a delivery time that works for you and arrange collection within 3 working days of your hire end date. Deliveries and collections between 8am–5pm, Monday to Friday, Saturday collections can be arranged if suitable.

Dispatch Times
Orders placed by 1pm are dispatched same day where possible. Some products carry a manufacturing lead time, this is always stated in the product description.

Need Help?
Call us: 01709 437 141
Email: [email protected] Available 8:30am - 5pm Mon-Fri

We are happy to help with any delivery or product questions.

Part of WOLFFKRAN, trusted since 1854