Skip to content
WolffKran Group · Est. 1854Fast UK delivery & export optionsPrice match promiseCredit accounts for business01709 437141
Prices
Modulift MOD 110 modular spreader beam
1 / 2

Modulift MOD 250 Spreader Beam Hire

Part no. LGH-HIRE-MODULIFT-MOD250-2-0M
Weekly hire
From £894.12/wkFrom £745.10/wkInc VATEx VAT
From £745.10/wk ex VATFrom £894.12/wk inc VAT ·
Span: 2.0m
Hire cannot start on days highlighted with a dotted border.
Total: £ ()
Excluding any selected add-ons
Hire return within days

About this item

  • Weekly hire of a complete Modulift MOD 250 spreader beam
  • Rated 250t to 400t depending on variant, spans 2.0m to 15.5m
  • Supplied as a complete component set for your span, certified, delivered per mile

Product description

Hire a complete Modulift MOD 250 modular spreader beam, built to the span you need and supplied as end units, drop links, struts, nuts and bolts.

Modulift spreader beams are DNV type approved. The MOD 250 is rated 250 t at 14 m, 300 t at 13 m or 400 t at 11 m span (30° STV), depending on variant.

It is a heavy-lift beam for large modules, transformers and offshore lifts. Components are heavy (up to 860 kg), so plan for handling equipment when building it.

Hire is by the week from our UK hire fleet partner, charged on weekdays only, and every beam arrives with a current report of thorough examination and the Modulift instructions.

Delivery and collection are charged per mile from our Sheffield depot. Lead times are estimated and confirmed when you book.

To buy MOD 250 parts instead, see our Modulift range.

Key Features
  • Rated 250 t at 14 m, 300 t at 13 m or 400 t at 11 m span (30° STV), depending on variant
  • Spans: 2.0 to 15.5 m in 0.5 m steps (Modulift range up to 21 m)
  • Supplied as a complete beam set
  • DNV type approved
  • Current report of thorough examination supplied
  • Matched shackles available on hire

Specifications

SeriesModulift MOD 250
Rating250 t at 14 m, 300 t at 13 m or 400 t at 11 m span (30° STV), depending on variant
Spans available2.0 to 15.5 m in 0.5 m steps (Modulift range up to 21 m)
Longer spansReduced capacity at longer spans; see the Load v Span table for the variant
ComponentsVariant end units and drop links (125, 150 or 200 t); struts 0.5 to 6.0 m; M24 x 80 Grade 8.8 bolts, 250 Nm
Matched shacklesDepends on variant (available on hire)
Sling to vertical angle45° or less
Hire periodWeekly, weekdays charged
CertificationCurrent report of thorough examination
What's Included
  • 1 x Modulift MOD 250 spreader beam set for the chosen span (end units, drop links, struts, nuts and bolts)
  • Report of thorough examination and user instructions

Documents (2)

View on this page or download.

PDFUser Instructions
PDF document
PDFInspection Guide
PDF document

Using and looking after it

Always read the manufacturer’s instructions before use. See the documents

Typical Applications
  • Plant and machinery installation
  • Precast and steelwork lifts
  • Tandem and multi-point lifts

Buying guide

Choosing the Configuration

Tell us the load, the span between lifting points and the sling angle, and we will confirm the configuration and WLL from the Modulift Load v Span table. The MOD 250 comes in three variants (250/250, 250/300 and 250/400), so we will confirm which one is supplied for your lift.

For heavier lifts, see MOD 400/400 hire.

Questions and answers

Q: Are shackles included?

A: No, they are available on hire separately. Use the sizes Modulift specifies.

Q: How is hire charged?

A: By the week, counting weekdays only, so a seven-day hire is one week.

Q: Can I extend the hire?

A: Yes. Contact us before the hire ends.

Have a question about this product?Ask a question

More in Modulift

View all →