Pramac LX Plus 90/150 LFP

Pramac LX Plus 90/150 LFP

Part no. PRAMAC-LX-PLUS-90-150-LFP
£136,500.00£113,750.00Inc VATEx VAT
£113,750.00 ex VAT£136,500.00 inc VAT ·

About this item

  • 90kVA output with 144kWh lithium iron phosphate (LFP) battery storage, the largest in the range
  • 400/230V three-phase 50Hz supply with UK socket panel fitted
  • MPPT solar input for direct panel charging; silent with no fuel or emissions in use

Product description

The Pramac LX Plus 90/150 LFP is the largest unit in the Pramac BESS range: 90 kVA three-phase output and 144 kWh of lithium iron phosphate storage.

It can carry a large site through the night or run alongside a generator to cut its hours sharply.

Usable energy is 124.4 kWh, with a 150 kW peak and 200 A pass-through.

Key Features
  • 90 kVA three-phase, 150 kW peak for 5 seconds
  • 124.4 kWh usable from 144 kWh installed
  • 200 A pass-through, highest in the range
  • IP44, -10 to +50 °C operation
  • MPPT solar input and UK sockets

Specifications

ModelLX Plus 90/150 LFP
Continuous output90 kVA
Peak output (5 s)150 kW
Supply400/230 V 50 Hz three phase
Storage capacity144 kWh
Usable energy (90% DoD, AC side)124.4 kWh
Battery chemistryLithium iron phosphate (LFP)
Battery modules30 x 4.8 kWh, 48 V DC
Battery weight1,200 kg
Inverters6 x 15 kVA
Noise76 dB(A) LWA; 58 dB(A) LpA at 1 m
Input connections1 x 125 A CEE 3P+N+T (grid), 1 x 125 A CEE 3P+N+T (generator)
Outputs (Pramac standard panel)1 x 16 A CEE 2P+T, 1 x 32 A CEE 3P+N+T, 1 x 63 A CEE 3P+N+T, 1 x 125 A CEE 3P+N+T; individual RCD on single-phase sockets, common RCD on three-phase
ControlsGSM remote monitoring, automatic generator start signal, inverter protection (short circuit, overload, over-temperature, low battery), battery isolator
Other50/60 Hz; options: 2 or 4 MPPT controllers, Powerlock connection, galvanised skid; cold weather kit option
Design life6,000 cycles
Pass-through capacity200 A
ProtectionIP44
Operating temperature-10 to +50 °C
Configuration+HUK (UK socket panel) +MPPT (solar input)
Dimensions (L x W x H)2,740 x 1,160 x 2,118 mm
Weight3,000 kg
What's Included
  • Pramac LX Plus 90/150 LFP battery energy storage unit
  • UK socket panel (HUK) fitted
  • MPPT solar input fitted
  • Operator and commissioning documentation

Solar panels, generator and site distribution are not included.

You may also need: the Pramac LX 60/100 LFP if your load or run time differs.

Documents (1)

View on this page or download.

PDFProduct card
PDF document

Using and looking after it

Always read the manufacturer’s instructions before use. See the documents

Typical Applications
  • Major construction sites and compounds
  • Hybrid systems paired with a large Stage V generator
  • Festivals and large outdoor events
  • Infrastructure work in low emission zones

Buying guide

Design & Construction

Two figures matter. kVA is the power the unit can deliver at once; kWh is the energy stored, which sets how long it lasts. Usable energy is quoted at 90% depth of discharge (DoD, how far the battery is drained) measured on the AC side, so it allows for inverter losses.

Divide usable kWh by your average load in kW for an estimated run time.

Peak output (150 kW for 5 seconds here) covers the brief surge as motors and compressors start. Pass-through (200 A) is the current a generator or mains supply can feed through the unit to your loads while it recharges the battery.

The cells are lithium iron phosphate (LFP), a lithium chemistry that is more thermally stable and longer lived than standard lithium-ion, with a 6,000-cycle design life. MPPT (maximum power point tracking) is a solar charge controller that gets the most from panels as light changes, so they can charge the battery directly.

On a hybrid site the battery carries the load through quiet periods and the generator runs only to recharge.

Choosing the Right Model

Size on your 24-hour energy use in kWh, not only the peak load. A site drawing 3 kW for 16 hours needs 48 kWh, however small its peak.

Model Output Usable energy Peak (5 s) Phase Pass-through
SX 5/10 5 kVA 8.3 kWh 9 kW Single 32 A
SX 10/15 10 kVA 12.4 kWh 18 kW Single 32 A
SX Plus 5/25 5 kVA 20.5 kWh 10 kW Single 50 A
SX Plus 10/40 10 kVA 33.2 kWh 20 kW Single 80 A
MX 15/40 15 kVA 32.8 kWh 30 kW Three 63 A
MX 30/60 30 kVA 49.8 kWh 60 kW Three 63 A
LX 45/80 45 kVA 66.4 kWh 75 kW Three 100 A
LX 45/100 45 kVA 82.9 kWh 75 kW Three 100 A
LX 60/100 60 kVA 82.9 kWh 120 kW Three 125 A
LX Plus 90/150 90 kVA 124.4 kWh 150 kW Three 200 A

Questions and answers

Q: What does the 200 A pass-through do?

A: It lets a generator or mains supply feed your site through the unit while also charging the battery, up to 200 A.

Q: Can it replace a generator entirely?

A: On a light, predictable load with mains or solar to recharge it, yes. On most sites the practical answer is hybrid: the battery plus a smaller generator running a few hours a day.

Q: Does Stage V apply to it?

A: No. Stage V is an engine emissions standard, and the unit has no engine. On hybrid sites, pair it with a Stage V generator.

Have a question about this product?Ask a question