The Invicta ICAP-2 Crane / Fork Mounted Access Platform offers both crane slung and fork mounting as standard, delivering dual-use versatility from a single attachment. More commonly used in construction environments via overhead crane, it encompasses the proven safety features of the IAP range including automatic locking gate, mesh protection on all sides and safety harness attachment rings. Manufactured in Leeds by Invicta Forks & Attachments.
Key Features
- Dual crane slung and fork mounted capability — two lifting methods from one attachment
- Automatic locking and unlocking gate — safe entry and exit without manual latching
- Low level, rear and overhead mesh protection — comprehensive safety enclosure
- Safety harness attachment rings — anchor points for personal fall protection
- Self-draining non-slip floor — safe footing in wet conditions
- 500kg capacity for 2 persons — higher capacity than standard fork-mounted platforms
- Painted bright orange for safety — high-visibility finish for on-site safety compliance
Technical Specifications
| Model |
Access Type |
Persons |
Platform L×W×H (mm) |
Capacity (kg) |
Weight (kg) |
| ICAP-2 |
Side Gate |
2 |
1220 × 1220 × 2320 |
500 |
238 |
Maximum fork section: 150 × 50mm at 525mm centres.
UK Manufactured | LOLER Compliant
This product is designed and manufactured in the UK by Invicta Forks & Attachments, the UK's largest mechanical forklift attachment manufacturer, based in Leeds. Where applicable, this product is supplied with a test certificate and EC Declaration of Conformity. LOLER 1998 thorough examinations are required every 6 months by a competent person after initial certification.
A platform lifts people, which carries requirements no other attachment does — a MEWP or tower is the preferred option wherever practicable. For crane-suspended work see access cages and man baskets.
Inspection and Maintenance
Inspect regularly with particular attention to all weld points, lifting eyes, pivot points and any signs of deformation or corrosion. Certified for six months from manufacture — thorough examination under LOLER 1998 required every 6 months.