Lifting Beams & Frames Hire
Spreader beams and lifting frames to hire, sized to your lift and supplied with current certification. Choose Multi-Sec modular spreader beams, multi-point beams and header slings, or Modulift MOD 6 to MOD 400 modular spreader beams made up to your span. To buy rather than hire, see our spreader beams, Modulift parts and lifting frames.
- Products
- 22
- Brands
- Multi-Sec, Modulift
- Price from
- £47
- Certification
- ✓ UKCA & CE
-
Multi-SecMulti-Sec MP-25 Multi-Point Lifting Beam HireSpan3m – 6mAvailable2 sizesDelivery2–3 daysfrom£481.48inc VAT£401.23ex VAT -
Multi-SecMulti-Sec MP-13 Multi-Point Lifting Beam HireSpan3m – 6mAvailable2 sizesDelivery2–3 daysfrom£267.86inc VAT£223.22ex VAT -
Multi-SecMulti-Sec Multi F 50 Modular Lifting Frame Hire (up to 3m x 3m)Working load .50tPart no.MS-HIRE-LF-50Delivery2–3 days£476.10inc VAT£396.75ex VAT -
Multi-SecMulti-Sec Multi F 25 Modular Lifting Frame Hire (up to 3m x 3m)Working load .25tPart no.MS-HIRE-LF-25Delivery2–3 days£351.90inc VAT£293.25ex VAT -
Multi-SecMulti-Sec Multi F 13 Modular Lifting Frame Hire (up to 3m x 3m)Working load .13tPart no.MS-HIRE-LF-13Delivery2–3 days£279.46inc VAT£232.88ex VAT -
Multi-SecMulti-Sec Multi 50 Modular Spreader Beam HireLifting centr.2m – 4mAvailable3 sizesDelivery2–3 daysfrom£113.90inc VAT£94.92ex VAT -
Multi-SecMulti-Sec Multi 25 Modular Spreader Beam HireLifting centr.2m – 4mAvailable3 sizesDelivery2–3 daysfrom£93.20inc VAT£77.67ex VAT -
Multi-SecMulti-Sec Multi 13 Modular Spreader Beam HireLifting centr.2m – 4mAvailable3 sizesDelivery2–3 daysfrom£56.57inc VAT£47.14ex VAT
Lifting Beams & Frames Hire
Why these are usually hired
Spreader beams and lifting frames are sized to a specific lift. Buying one for a single project rarely makes sense, and storing it afterwards brings examination obligations for equipment you may not use again.
Specify against the lift
We need the load weight, the distance between lifting points, the available headroom and the sling arrangement above the beam. Headroom is the one most often forgotten and the one most likely to stop a lift on the day.
Modular where the lift is uncertain
Modular beams assemble to different spans and capacities from the same components, which suits projects where the final dimensions are not yet fixed.
What do you need to quote?
Load weight, the span between lifting points, available headroom, and how the beam will be rigged above. Headroom is the detail most often missed.
Is certification included?
Yes, supplied with the equipment and current for the hire period.
Which brands do you stock for Lifting Beams & Frames Hire?
What else is in Hire?
Related ranges include Load Cell Hire, Shackle Hire, Sling Hire, Material Lift Hire and Hoist Hire.