Mon — Fri: 8:30am — 5:00pm
Sat — Sun: Closed
London & Sheffield Offices
Part of the Wolffkran Group
German Engineering Since 1854
Mon — Fri: 8:30am — 5:00pm
Sat — Sun: Closed
London & Sheffield Offices
Part of the Wolffkran Group
German Engineering Since 1854
Steel lifting frame for safe crane movement of portable toilets around site. Removable stabilising bar (stows during loading), crane lifting points, fork pockets, cut-out frame for tap access. Also known as Portaloo Lifter. WLL 1000kg. Purchase only.
In stock - ready to dispatch
Order today ยท Receive within 2-3 working days ยท UK mainland.
View Full Delivery Information →Steel lifting frame for safe crane movement of portable toilets around site. Removable stabilising bar, crane lifting points, fork pockets, cut-out frame design for tap access. Popular for excavation projects where ground-level access is restricted. Also known as a Portaloo Lifter. WLL 1000kg. Purchase only.
The Conquip Portable Toilet Lifting Frame, also known as a Portaloo Lifter, is a robust steel lifting frame designed to enable the safe movement of portable toilets around site. It is particularly popular for excavation projects where access to ground level is restricted, allowing toilets to be lifted to operative working areas (such as deep excavations, basements, or upper floors of in-progress structures) so that operatives do not have to lose productive time travelling back to main site facilities. The frame features a removable stabilising bar that can be attached to the side of the frame during loading and unloading. This is a key safety feature -- it eliminates the risk of the bar causing injury during the awkward operation of lifting a portable toilet into and out of the frame. Once the toilet is in place, the bar is fitted across the top of the frame to secure the load during the lift. The cut-out frame design provides easy access to taps on the side of the toilet, so operatives can use the unit without difficulty when it is positioned at the working area. Crane lifting points and fork pockets at the base allow flexible manoeuvring -- crane lift to position the unit at depth or height, forklift handling for short-distance moves around the laydown area.
Manufactured in the UK from quality steel for durability and reduced repair or replacement costs. Best-practice solution for portable toilet handling on excavation, infrastructure, and high-rise projects. WLL 1000kg. Purchase only.
| Product Code | CA140AD-01000 |
|---|---|
| Length | 1400mm |
| Width | 1520mm |
| Height | 2370mm |
| Weight | 300kg |
| Working Load Limit | 1000kg |
| Stabilising Bar | Removable, stows on side during loading/unloading |
| Frame Design | Cut-out design for tap access |
| Lifting Method | Crane via integrated lifting points |
| Manoeuvring Method | Fork pockets for forklift handling |
| Compliance | LOLER 1998, PUWER 1998 |
The Portable Toilet Lifting Frame is essential for any project where operatives are working at depth, height, or distance from the main site facilities. Common applications include deep excavation projects (basement and infrastructure work), high-rise construction (lifting toilets to active working floors), and large-footprint projects where travel to a centralised welfare area would consume significant productive time. Without this frame, the alternative is either expensive duplicate welfare provision at the working area or significant lost productive time as operatives travel to and from facilities. Also called a Portaloo Lifter or portable toilet crane lift frame.
Warning: Working Load Limit of 1000kg must not be exceeded. The stabilising bar must be securely fitted across the top of the frame before any lift -- never lift with the bar removed or only partially fitted. Verify the toilet is centred and seated correctly in the frame before lifting. Inspect before every use under LOLER 1998.
The removable stabilising bar can be stowed on the side of the frame during loading and unloading, eliminating the risk of the bar causing injury during the manual handling phase. Once the toilet is in place, the bar is fitted across the top of the frame to secure the load during the lift.
Yes. The frame includes integrated crane lifting points for vertical lifts and fork pockets at the base for forklift handling around the laydown area.
Yes. The cut-out frame design provides easy access to the taps on the side of the toilet, so the unit can be used without difficulty when positioned at the working area.
This product is supplied on a purchase-only basis.
How it works
At WOLFF Onsite, weโve made renting equipment an effortless experience. Our streamlined process ensures you have fast access to quality equipment and heavy lifting accessories, tailored specifically to your project needs, exactly when you require them.
Currently, we operate on an enquiry basis. Simply reach out with your requirements, and our team will respond promptly with a customised quote to match your project scope and timeline.
From initial consultation to final handover and ongoing, we offer full support every step of the way, guaranteeing that your rental experience runs smoothly and efficiently.
Contact our team to discuss your project requirements and choose the right equipment.
Weโll provide a customised quote based on your needs and rental period.
Our experts deliver and set up the equipment at your site.
Receive full support throughout the rental period to ensure everything runs smoothly.
Part of WOLFFKRAN, trusted since 1854
From our depot to your site, every order is fully tracked and delivered on our own WOLFF Onsite vehicles or via trusted courier partners. Delivery costs are calculated based on your postcode and order size.
Pallet Delivery
Dispatched within 1โ2 working days, delivered next working day between 8amโ5pm, Monday to Friday. Delivery cost is based on the number of pallet spaces and your delivery zone.
Parcel Delivery
Smaller items like radio accessories and safety equipment ship via tracked courier at a flat rate. Deliveries between 8:30amโ5pm, Monday to Friday.
RENTAL Delivery / Collection
All rentals are delivered and collected by the WOLFF Onsite team. We'll confirm a delivery time that works for you and arrange collection within 3 working days of your hire end date. Deliveries and collections between 8amโ5pm, Monday to Friday, Saturday collections can be arranged if suitable.
Dispatch Times
Orders placed by 1pm are dispatched same day where possible. Some products carry a manufacturing lead time, this is always stated in the product description.
Need Help?
Call us: 01709 437 141
Email: hello@wolffonsite.co.uk Available 8:30am - 5pm Mon-Fri
We are happy to help with any delivery or product questions.
Part of WOLFFKRAN, trusted since 1854