Skip to content
WolffKran Group · Est. 1854Fast UK delivery & export optionsPrice match promiseCredit accounts for business01709 437141
Prices
Modulift MOD 70H - End Unit
1 / 2

Modulift MOD 70H - Drop Link

Part no. MODU-0070H-DL050
£536.18£446.82Inc VATEx VAT
£446.82 ex VAT£536.18 inc VAT ·

About this item

  • Genuine Modulift MOD 70H drop link
  • Series rated 100t at 8.5m span (30° STV), up to 14m
  • Two drop links required per beam

Product description

This is a genuine Modulift MOD 70H drop link, part 0070H/DL050, an individual component for building a MOD 70H modular spreader beam. A complete beam uses a pair of MOD 70H end units, a pair of drop links and the struts that set the span.

Drop links connect the lifting slings to the end units.

They set where the sling load enters the beam and keep sling and beam correctly aligned. The MOD 70H series is rated 100 t at 8.5 m span at 30° sling-to-vertical (61 t at 45°), with spans up to 14 m at reduced capacity.

The working load limit depends on the assembled span and sling angle; check the Load v Span table.

Key Features
  • Genuine Modulift MOD 70H drop link
  • Series rated 100 t at 8.5 m span at 30° sling-to-vertical (61 t at 45°)
  • Spans up to 14 m
  • Matched shackles 85 t top, 55 t lower
  • Two needed per beam
  • Manufacturer certification supplied

Specifications

Part number0070H/DL050
SeriesModulift MOD 70H
ComponentDrop Link
Component WLL50 t (pair 100 t)
Component weight32 kg
Series rated capacity100 t at 8.5 m span at 30° sling-to-vertical (61 t at 45°)
Maximum span14 m at reduced capacity
Assembled span range1 to 14 m in 0.5 m steps
Maximum struts per assembly5
Bolting6 x M20 Grade 8.8 per connection, 150 Nm
StrutsStandard MOD 70 struts
Matched shackles85 t top, 55 t lower
Complete set weight at max span1,090 kg
Heaviest component in series240 kg
CertificationManufacturer certification supplied

Documents (2)

View on this page or download.

PDFModulift MOD 70H User Instructions
PDF document
PDFModulift Inspection Guide
PDF document

Using and looking after it

Always read the manufacturer’s instructions before use. See the documents

Typical Applications
  • Two-point lifts keeping slings clear of the load
  • Lifts with limited headroom
  • Loads that would be damaged by sling compression

Questions and answers

Q: How many drop links does a beam need?

A: Two, one at each end.

Q: Can I mix series?

A: No. Use one series throughout, except that the MOD 70H uses standard MOD 70 struts. Never fit MOD 70 end units or drop links.

Q: Can you specify the assembly?

A: Yes. Give us the span, the load and the sling-to-vertical angle and we will specify the struts, end units and drop links.

Have a question about this product?Ask a question

More in Modulift

View all →