Skip to content
WolffKran Group · Est. 1854Fast UK delivery & export optionsPrice match promiseCredit accounts for business01709 437141
Prices
Yale CPE electric chain hoist
1 / 8

Yale CPE / CPEF Heavy-Duty Electric Chain Hoist (1.6 t to 10 t)

Part no. YAL-CPE168-HOOK
£4,417.25£3,681.04Inc VATEx VAT
£3,681.04 ex VAT£4,417.25 inc VAT ·
Model: CPE 16-8 – 1,600 kg
Suspension: Hook Suspension

About this item

  • 1,600 kg to 10,000 kg heavy-duty electric chain hoist
  • Top hook, push trolley or single/dual-speed electric trolley
  • Pendant included; lift height and options priced on the page

Product description

The Yale CPE is CMCO's heavy-duty electric chain hoist, built in Germany since 1994 with a cast-iron housing for long life in hard industrial use.

It covers 1,600 kg to 10,000 kg: single speed (CPE) or dual speed (CPEF), on a top hook, a push trolley or an integrated electric trolley.

Choose the model and suspension, set the height of lift (3 m included, extra metres priced), and add options such as chain containers, limit switches, a crane pendant or radio remote. The price updates as you go.

Key Features
  • 1,600 kg to 10,000 kg, single or dual speed
  • Extremely robust cast-iron housing for heavy-duty, high-cycle work
  • 42 V low-voltage control as standard, IP65 encapsulated pendant with 2.5 m pendant cable
  • Electromagnetic brake holds the load if the power fails
  • Slip clutch overload protection
  • 400 V, 3-phase, 50 Hz; motor IP54, insulation class F
  • Push, single-speed or dual-speed electric trolleys

Specifications

Supply 400 V, 3-phase, 50 Hz. Control voltage 42 V. Pendant IP65, motor IP54, insulation class F. Load chain 11.3 x 31 mm. Classification 1Am/M4 or 1Bm/M3 depending on model. Full data and dimensions are in the datasheet and manual (Datasheets tab).

How it's built
  • Cast-iron housing, made by Yale in Germany since 1994. The hoist is made from three main modules, which keeps servicing simple.
  • Planetary gearbox running in an oil bath, lubricated for life.
  • Case-hardened, zinc-plated load chain (11 x 31 mm) running over a five-pocket chain sheave of hardened steel. Stainless steel chain is available as an option.
  • Forged hooks in high-tensile steel, with safety latches.
  • Spring-applied disc brake that holds the load if the power fails.
  • Slip clutch set at 125% of rated capacity, so the hoist will not lift a serious overload.
  • Thermal protection on the motor, 42 V control and an IP65 pendant with emergency stop.
  • The 10 t model is two CPEF 50-2 hoists joined on a frame.
Before you order
  • Power: 400 V, 3-phase, 50 Hz as standard. Other voltages to order.
  • Your beam: check the flange width and thickness, and the headroom above the load, against the Models and Specifications details.
  • Where it will work: rated for -20 to +50 °C. It must not be used in explosive atmospheres. Ask us before ordering for very humid, salty or chemical environments.
  • Inspection: the hoist needs a thorough examination by a competent person before first use and at least every 12 months, as required by LOLER and Yale's instructions.
  • Warranty: 2 years from Yale, excluding wear parts.
Models
Model Capacity Chain falls Lifting speed Classification Hoist motor Duty (ED)
CPE 16-8 1,600 kg 1 8 m/min 1Am/M4 – –
CPEF 16-8 1,600 kg 1 8/2 m/min 1Am/M4 2.3/0.58 kW 40/20 %
CPE 20-8 2,000 kg 1 8 m/min 1Bm/M3 – –
CPEF 20-8 2,000 kg 1 8/2 m/min 1Bm/M3 2.8/0.7 kW 25/15 %
CPE 25-5 2,500 kg 1 5 m/min 1Am/M4 – –
CPEF 25-5 2,500 kg 1 5/1.2 m/min 1Am/M4 2.3/0.58 kW 40/20 %
CPE 30-5 3,000 kg 1 5 m/min 1Bm/M3 – –
CPEF 30-5 3,000 kg 1 5/1.2 m/min 1Bm/M3 2.8/0.7 kW 25/15 %
CPE 32-4 3,200 kg 2 4 m/min 1Am/M4 – –
CPEF 32-4 3,200 kg 2 4/1 m/min 1Am/M4 2.3/0.58 kW 40/20 %
CPE 40-4 4,000 kg 2 4 m/min 1Bm/M3 – –
CPEF 40-4 4,000 kg 2 4/1 m/min 1Bm/M3 2.8/0.7 kW 25/15 %
CPE 50-2 5,000 kg 2 2 m/min 1Am/M4 – –
CPEF 50-2 5,000 kg 2 2/0.5 m/min 1Am/M4 2.3/0.58 kW 40/20 %
CPEF 75-1.6 7,500 kg 3 1.6/0.4 m/min 1Am/M4 2.8/0.58 kW 40/20 %
CPEF 100-2 10,000 kg 4 2/0.5 m/min 1Am/M4 2 x 2.3/0.58 kW 40/20 %
Prices (ex VAT, 3 m height of lift)
Model Capacity Top hook Push trolley Electric trolley (single speed) Electric trolley (dual speed) Extra lift per metre (hook)
CPE 16-8 1,600 kg £3,681.04 £4,482.34 £5,018.72 £5,290.15 £57.32
CPEF 16-8 1,600 kg £3,894.08 £4,723.49 £5,433.98 £5,497.77 £57.32
CPE 20-8 2,000 kg £3,851.58 £4,661.86 £5,094.41 £5,375.58 £57.32
CPEF 20-8 2,000 kg £3,979.51 £4,747.28 £5,519.39 £5,583.21 £57.32
CPE 25-5 2,500 kg £3,851.90 £4,832.71 £5,179.85 £5,392.88 £57.32
CPEF 25-5 2,500 kg £4,064.93 £5,045.74 £5,459.92 £5,672.95 £57.32
CPE 30-5 3,000 kg £3,936.25 – £5,265.28 £5,494.53 £57.32
CPEF 30-5 3,000 kg £4,150.37 – £5,545.36 £5,774.60 £57.32
CPE 32-4 3,200 kg £4,021.67 – £5,438.29 £5,545.36 £105.97
CPEF 32-4 3,200 kg £4,234.71 – £5,630.79 £5,838.40 £105.97
CPE 40-4 4,000 kg £4,107.11 – £5,752.96 £5,793.09 £105.97
CPEF 40-4 4,000 kg £4,320.14 – £5,860.04 £5,923.85 £105.97
CPE 50-2 5,000 kg £4,192.54 – £5,520.48 £5,800.56 £105.97
CPEF 50-2 5,000 kg £4,405.57 – £5,945.46 £6,009.00 £105.97
CPEF 75-1.6 7,500 kg £5,519.39 – – £8,773.29 £154.64
CPEF 100-2 10,000 kg £11,795.77 – – £14,101.28 £203.30

Push trolleys are available up to 2.5 t. Electric trolleys travel at 11 m/min (single speed) or 11/2.8 m/min (dual speed); 7.5 t and 10 t run at 5/1.5 m/min on beam flanges 125–310 mm. Other trolleys fit 98–180 mm flanges.

Height of Lift and Chain Containers

Prices include a 3 m height of lift. Choose a longer lift on the page and the extra chain is added per metre.

Chain containers are sized by the length of chain they hold, so the page offers the container that suits the lift and number of chain falls you choose. The CPEF 100-2 uses a pair of containers.

Options
  • Chain containers for lifts up to 46 m (single fall)
  • Geared limit switch for the hoist (up to 7.5 t)
  • Travel limit switches and 6-button crane control pendant for electric trolleys
  • Radio remote control, Magnetek Flex Base, complete with charger (up to 7.5 t)
  • Top hook turned 90°, or hoist turned 90° on the trolley
  • Rubber buffers for trolleys, set of four
  • Textile rain coats for the hoist and trolley
  • CEE plug for the supply cable

Replacement load chain, pendants and remotes are on our Yale electric hoist accessories page. For other voltages or special designs, request a configured quote.

Documents (2)

View on this page or download.

PDFYale CPE/CPEF Datasheet (EN)
PDF document
PDFYale CPE/CPEF Operating Manual
PDF document

Buying guide

Choosing the right CPE

1. How it hangs. Pick the suspension to suit how the load needs to move.

Suspension Best for
Hook suspension A fixed lifting point. Hangs from a beam clamp, lifting eye or a trolley you already have.
Push trolley Short runs along a beam, with the operator pushing the load by hand.
Electric trolley Long runs, heavy loads and high beams where pushing is impractical. Driven from the same pendant as the hoist.

Trolleys fit these beams: up to 5 t, a bottom flange 98 to 180 mm or 180 to 300 mm wide; the 10 t, 125 to 310 mm. The flange can be up to 27 mm thick (40 mm on the 10 t).

Each trolley is set to its width range at the factory, so measure your beam before ordering. Curved track needs a radius of at least 1.8 to 2 m.

2. Single or dual speed. The CPE lifts at one speed. The CPEF adds a slow speed at a quarter of the main speed (for example 8 and 2 m/min), for setting loads down precisely, such as moulds, machinery or fit-out work.

If you mostly lift and move, single speed is enough.

3. How hard it will work. The classification in the Models table shows how much full-load use the hoist is built for:

  • 1Am (M4): about 800 hours at full load over its design life, which Yale puts at around 10 years of normal use. Motor duty 40%.
  • 1Bm (M3): the CPE 20-8, 30-5 and 40-4. About 400 hours at full load. Motor duty 25%.

Duty (ED) is the share of each working cycle the motor can run. If the hoist will lift close to its capacity many times a day, choose a 1Am model.

Questions and answers

Q: CPE or CPV?

A: The CPV is compact and covers 250 kg to 5 t for general use. The CPE has a heavier cast-iron build for demanding, high-cycle work and goes up to 10 t.

Q: Is the pendant included?

A: Yes, prices include a 2.5 m pendant cable and 42 V low-voltage control. A 6-button crane control pendant can be added on electric trolley versions.

Q: Can I order a longer lift?

A: Yes, choose any lift on the page up to the model's maximum. For anything longer, request a quote.

Have a question about this product?Ask a question

More in Electric Chain Hoists

View all →