The Eichinger 1034C Concrete Column Skip is a crane-lifted skip for placing wet concrete into columns, walls and narrow formwork.
A 200 mm rubber delivery hose on the discharge gate puts the concrete exactly where it is needed without segregation, and comes off for open slab pours.
It is filled lying down, then lifted upright by crane.
It is one of the crane-lifted concrete skips we stock; for rubble and general site waste, see our waste skips. Five sizes from 500 to 2,000 litres, made in Germany by Florian Eichinger GmbH.
Choose a size above to see its specifications.
| Model | Capacity | SWL | Height hanging | Width | Weight |
|---|---|---|---|---|---|
| 1034C.8 | 500 L | 1,200 kg | 2,200 mm | 1,050 mm | 290 kg |
| 1034C.10 | 750 L | On request | |||
| 1034C.12 | 1,000 L | 2,400 kg | 2,750 mm | 1,200 mm | 380 kg |
| 1034C.14 | 1,500 L | 3,600 kg | 2,980 mm | 1,500 mm | 570 kg |
| 1034C.16 | 2,000 L | 4,800 kg | 3,280 mm | 1,500 mm | 650 kg |
| Manufacturer / model | Florian Eichinger GmbH, 1034C |
|---|---|
| Outlet | 200 mm diameter, 3 m rubber delivery hose (removable) |
| Gate | Pull cord (3 m), spring return, adjustable tension |
| Gate-closing pulley | Standard on 1,000 L and above |
| Lifting | Bale arm or lifting bar depending on size |
| Certification | Built to official labour safety regulations (Eichinger) |
For high-volume groundworks pours, see the Eichinger 1025H Coneflow skip. On sites with a forklift or telehandler but no crane, browse our forklift attachments.
View on this page or download.
Always read the manufacturer’s instructions before use. See the documents
The skip lies on its side to be filled from a mixer chute, then the crane lifts it upright. Eichinger's German catalogue lists a lifting bar as standard with a bale arm above 1,000 litres, while UK-supplied skips are shown with a bale arm, so ask us to confirm the lifting arrangement for your size.
Concrete leaves through a gate at the bottom into the delivery hose, which is lowered into the formwork. The operator opens the gate with a 3 m pull cord in short pulls; releasing the cord lets a spring shut it again.
Spring tension is set with a nut above the gate. On 1,000 L and larger skips a gate-closing pulley gives a second rope to pull the gate positively shut.
The hose clips onto two hose clips while filling and lifting. Detach it and the skip pours straight from the gate, which suits slabs and larger areas.
Wet concrete weighs about 2.4 t per cubic metre, so each size's SWL is roughly its capacity full of concrete. Add the skip weight and check the total against your crane chart at the working radius.
| Size | SWL | Best suited to |
|---|---|---|
| 500 L | 1,200 kg | Single columns and small pours with lighter cranes (no gate-closing pulley) |
| 750 L | On request | Columns and walls where a 1,000 L skip is too heavy for the crane |
| 1,000 L | 2,400 kg | General column and wall pours on most tower crane sites |
| 1,500 L | 3,600 kg | Core walls, lift shafts and larger pours |
| 2,000 L | 4,800 kg | High-volume pours on heavy-lift cranes |
A: Yes. Every 1034C comes with a 200 mm x 3 m rubber delivery hose and a 3 m pull cord.
A: Yes. The hose detaches so the skip pours directly from the gate.
A: A second rope and pulley that pulls the gate firmly shut after a pour. It is standard on 1,000 L and larger skips, not on the 500 L.
A: Hose it out after every use, clearing the gate area inside and out. The kick-down hopper speeds this up. Slacken the spring before releasing the gate for deep cleaning and reset it afterwards.
Loading your basket…
Delivery calculated at checkout.
CheckoutCard, Apple Pay, Pay by bank, proforma or 30-day account