Concrete skips explained: types, sizes and how to choose

Published 1 November 2026 Updated 2 November 202624 min read
Concrete skips explained: types, sizes and how to choose

The quick answer

A concrete skip is a steel container that a crane lifts from the delivery point to the pour, where a gate lets the concrete out in a controlled flow. WOLFF's crane skips come in three main designs: column (tremie) skips with a hose for columns and walls, cone-shaped "banana" coneflow skips for directional pouring, and a geared horizontal round skip for slabs and groundworks, in sizes from 500 to 4,000 litres. Size the skip by weight, not volume. A cubic metre of normal concrete weighs about 2.4 tonnes, and the crane's duty at the pour radius must cover that plus the skip's own weight.

WOLFF Onsite stocks crane concrete skips from Conquip (UK) and Florian Eichinger GmbH (Germany), plus an Eichinger fork-mounted pouring skip for sites without crane access. The full range is in the concrete skips category. This guide explains how each design works, how to size one against your crane, and how to keep it working: cleaning, inspection and the UK rules that apply.

WOLFF's concrete skips compared

Every figure in this table comes from our product pages. Where a figure isn't published, the table says so. Don't estimate it.

Product Type Capacities Lifting Discharge Rated load and self-weight
Conquip Concrete Skip With Bale Arm Column / tremie skip 500, 750, 1,000, 1,500, 2,000 L Single point, integrated bale arm Lever-released gate, spring retractor, 3 m hose WLL 1,500 to 6,000 kg depending on size. Per-size WLL and self-weight not published.
Conquip Concrete Skip Without Bale Arm Column skip, four-point lift 500, 1,000, 1,500, 2,000, 3,000, 4,000 L Four-point, supplied four-leg chain sling Lever-released gate, spring retractor, 3 m hose Not published. Check before ordering.
Eichinger Concrete Column Skip 1034C Column skip, laydown 500, 750, 1,000, 1,500, 2,000 L Bale arm; traverse on models over 1,000 L Pull-cord gate, spring return, 200 mm × 3 m hose SWL 1,200 / 2,400 / 3,600 / 4,800 kg (500 / 1,000 / 1,500 / 2,000 L). Weight 290 / 380 / 570 / 650 kg. 750 L: ask us for figures.
Conquip Concrete Coneflow Skip Cone-shaped "banana" skip 500, 750, 1,000 L Bale (length with bale 2,300 to 2,790 mm) Geared flow gate WLL 1,500 / 2,250 / 3,000 kg. Weight 170 / 300 / 400 kg.
Eichinger 1025H geared skip (listed as Coneflow Concrete Skip) Horizontal round, lateral outlet 500, 750, 1,000 L Bale arm; traverse on 1,000 L Geared hand wheel gate, locking chain SWL 1,200 / 1,800 / 2,400 kg. Weight 260 / 360 / 460 kg.
Eichinger Forklift Concrete Pouring Skip 2016 Fork-mounted pouring skip Includes 500 and 1,000 L Forklift or telehandler, stacker shoes Lever-operated lateral gate, 200 mm tremie adapter and 1 m hose Not published. Contact WOLFF.
Conquip concrete column skip with integrated single-point bale arm and conical bottom discharge gate
Conquip Concrete Skip With Bale Arm, also known as a tremie skip

How a crane concrete skip works

Every crane concrete skip holds wet concrete, carries it on the hook and releases it through a controllable gate. The designs differ in how they are filled, how they hang and how the gate opens.

Filling

Most crane skips are filled lying down. The Eichinger 1034C column skip has a "laydown design" so it can be loaded horizontally. The Conquip bale arm skip is "designed to lay horizontally on the ground for direct filling from the concrete truck". The Conquip Coneflow lays flat for filling from a ready-mix wagon or pump. Filling at ground level means the truck chute or pump hose only has to reach a low opening, not the top of a skip standing upright.

Once the skip is full, the crane lifts it and it rotates from lying to hanging. Two of the Conquip designs include a roll frame. Conquip says the roll frame on its Coneflow gives a smooth horizontal-to-vertical transition with reduced swing. On the bale arm column skip, it "prevents bending and concrete filling up in the channels".

Carrying

The skip is attached to the crane in one of two ways:

  • Bale arm (single point). A rigid steel arm over the top of the skip takes the crane hook directly. The Conquip Concrete Skip With Bale Arm, the Eichinger 1025H and the Eichinger 1034C are supplied with a bale arm. Eichinger fits a traverse (crossbeam) on its larger sizes: the 1,000 L 1025H and the 1034C models over 1,000 L.
  • Four-point lift. The Conquip skip without bale arm has four lifting points and comes with a four-leg chain sling "rated to match the skip capacity". Conquip says this gives a balanced, lower-profile lift that suits restricted headroom and tall column pours where there's no room for a bale arm.

Discharging

At the pour, a gate in the bottom or side of the skip opens to let concrete out. Column skips use a rubber hose on the gate to guide concrete down into the form, and the Conquip column skips have a conical bottom that funnels concrete to the gate. The Eichinger 1025H releases concrete through a side (lateral) outlet, and the Conquip Coneflow through a funnelled outlet. How the gate is opened, by lever, pull cord or geared wheel, is one of the biggest practical differences between models. It is covered in its own section below.

The types of concrete skip, one by one

Column skips (tremie skips) with a bale arm

A column skip is a tall skip with a conical bottom, a discharge gate and a hose. Conquip calls its version a "Tremie Skip" and describes it as "a versatile concrete pouring skip for columns, walls and narrow formwork". The hose is the important part. It lets the operative put the end of the hose down into a column or wall form, so concrete is placed close to where it ends up instead of falling from the top of the shutter. Dropping concrete a long way into a form can make it separate (segregate), with the heavy aggregate going to the bottom. Eichinger says the hose on its 1034C directs the flow "with precision and without segregation".

WOLFF stocks two bale arm column skips:

  • Conquip Concrete Skip With Bale Arm: five sizes from 500 to 2,000 L. Supplied with a 3 m reinforced rubber hose with pull rope, deflector plate, grout tray, spring retractor and a safety restraint chain that holds the bale arm when it isn't in use. The bale arm is box section, quick-release for replacement, and its lifting points take a shackle.
  • Eichinger Concrete Column Skip (Model 1034C): five sizes from 500 to 2,000 L, with a 200 mm × 3 m rubber delivery hose as standard. The hose can be removed for pouring slabs, which Eichinger says makes it "a truly universal concrete skip". It has a heavy-duty kick-down hopper for easier cleaning, and a gate-closing pulley as standard on 1,000 L models and above.
Eichinger 1034C concrete column skip for pouring columns, walls and narrow formwork
Eichinger Concrete Column Skip (Model 1034C)

Column skips without a bale arm (four-point lift)

The Conquip Concrete Skip Without Bale Arm has the same conical bottom, gate, 3 m hose, deflector plate, grout tray and spring retractor as the bale arm version. The difference is how it hangs: from four lifting points on a supplied four-leg chain sling. It also comes in bigger sizes, six from 500 to 4,000 L. Conquip says the 4,000 L is the largest concrete column skip in its range. Our product page lists BS EN 13155, the European standard for non-fixed load lifting attachments.

Choose this version when headroom under the hook is tight, or when you need more than 2,000 L in one lift and have a crane that can carry it. Remember that the sling is part of the lifting set. It needs its own identification and thorough examination record, and a replacement must be correctly rated for the skip and the leg angle. Our chain sling grades guide explains sling ratings, and the chain slings category lists replacement slings.

Conquip concrete column skip without bale arm, with four lifting points for a four-leg chain sling
Conquip Concrete Skip Without Bale Arm, lifted on a four-leg chain sling

Coneflow or "banana" skips

The Conquip Concrete Coneflow Skip is a cone-shaped skip that people on site often call a "banana skip". It lies flat to be filled, then hangs vertically to pour. The funnelled outlet directs the concrete where it's wanted, and a geared flow gate sets the pour rate. Conquip lists it for embankments, shuttered areas, footings and large slab pours. It comes in 500, 750 and 1,000 L, weighing 170, 300 and 400 kg, with WLLs of 1,500, 2,250 and 3,000 kg.

Conquip cone-shaped Coneflow concrete skip, often called a banana skip, front view
Conquip Concrete Coneflow Skip, often called a banana skip

Horizontal round geared skips

The Eichinger 1025H (listed on our site as Coneflow Concrete Skip) is a horizontal, barrel-shaped skip with a lateral (side) outlet and a geared gate worked by a hand wheel. Eichinger describes it as built "for fast, controlled pouring of concrete in large volumes". Eichinger says the low barrel shape gives good stability on the crane and cuts the risk of sloshing. The side outlet lets you pour straight into formwork, foundations and trenches. A locking chain holds the gate handle closed during filling and transport. Sizes are 500, 750 and 1,000 L, with SWLs of 1,200, 1,800 and 2,400 kg and self-weights of 260, 360 and 460 kg.

Eichinger 1025H horizontal round concrete skip with a side discharge outlet
Eichinger 1025H geared skip with hand wheel gate control

Fork-mounted concrete pouring skips

The Eichinger Forklift Concrete Pouring Skip (Model 2016) is for sites where "crane access is not available". It is low and square, with stacker shoes for the forks, a lateral outlet with a lever-operated gate, and a 200 mm tremie hose adapter with a 1 m hose as standard. Eichinger presents it as an economical way to place concrete, from small domestic pours to larger commercial groundworks, with a forklift or telehandler you already have. Its self-weight isn't on our product page, so ask us for it before you check it against your machine's load chart.

Don't confuse it with the fork-mounted waste skips in the fork-mounted skips category, such as the Eichinger Forklift Tipping Skip or the Invicta Auto-Lok Tipping Skip, made in Leeds by Invicta. Those tip their whole contents out at once. Our tipping skips guide covers them.

Concrete skip or tipping skip? Our product page for the Invicta Crane Slung Boat Skip puts it simply: "Waste skips tip. Where a pour must be placed accurately through a controlled gate, a concrete skip is the right tool." A boat skip or drop bottom skip is fine for moving mortar, aggregate or muck, but it can't meter a pour into a form.

Discharge gates and controls

The gate decides how precisely you can place concrete and where the operative has to stand. These are the gate controls in WOLFF's range:

Control How it works Found on Best for
Lever-released gate with spring retractor A lever releases the gate. A strong spring closes it automatically when the pour is finished. The gate is reinforced to cut wear and jamming. Conquip with bale arm, Conquip without bale arm Column and wall pours through the hose
Pull-cord gate with spring return A 3 m pull cord opens the gate from a distance. Releasing the cord lets the spring close it. Spring tension adjusts with a nut above the gate. A gate-closing pulley is standard on 1,000 L and above. Eichinger 1034C column skip Columns and walls where the operative should stand back from the skip
Geared hand wheel Turning the wheel opens the gate a little at a time. Turning it back closes it. Eichinger says it is "ideal for metering large volumes accurately". Eichinger 1025H Slabs, foundations and trenches, where steady flow matters more than stop-start
Geared flow gate A geared gate controls "pour speed and flow rate" through a funnelled outlet. Conquip Coneflow Directional pouring onto embankments, footings and slabs
Lever-operated lateral gate A lever opens a side outlet. A 200 mm tremie adapter and 1 m hose are supplied as standard. Eichinger forklift pouring skip Footings and groundworks from a forklift or telehandler

Two extra features on the Conquip column skips are worth knowing. The deflector plate stops concrete splashing people or the ground as the gate opens and closes. The grout tray catches excess concrete during gate operation. Both make a difference on finished floors or over work you don't want splattered.

Key terms

Term What it means
Bale arm The rigid lifting arm over a skip that takes the crane hook at a single point
Traverse A crossbeam that spreads the lift on larger skips (Eichinger fits one on its bigger sizes)
Tremie skip Another name for a column skip with a hose, used to place concrete down into deep or narrow forms
Banana skip Site name for a cone-shaped coneflow skip that lies flat to fill and hangs upright to pour
Laydown design A skip built to lie horizontally for filling from the truck chute
Roll frame A frame that controls the skip as it rolls from lying flat to hanging upright
Lateral outlet A discharge opening in the side of the skip rather than the bottom
Kick-down hopper Eichinger's hopper design on the 1034C, made for quicker cleaning
Segregation When the parts of a concrete mix separate, for example when it falls a long way into a form
SWL / WLL Safe working load / working load limit: the most the skip is rated to carry, as marked on it
Duty (crane) What the crane can lift at a given radius, read from its load chart
Radius The horizontal distance from the crane's centre of rotation to the hook
Thorough examination The periodic inspection by a competent person that LOLER requires for lifting equipment

Sizing a concrete skip by volume and by weight

Skips are sold by volume in litres, but cranes lift weight. That is why sizing is a two-step job.

Step 1: convert litres to tonnes

1,000 litres is 1 cubic metre. Normal-weight concrete is roughly 2,400 kg per cubic metre, so:

Skip size Volume Concrete weight when full (at 2,400 kg/m³)
500 L 0.5 m³ 1,200 kg
750 L 0.75 m³ 1,800 kg
1,000 L 1.0 m³ 2,400 kg
1,500 L 1.5 m³ 3,600 kg
2,000 L 2.0 m³ 4,800 kg
3,000 L 3.0 m³ 7,200 kg
4,000 L 4.0 m³ 9,600 kg

2,400 kg/m³ is a working figure for normal concrete, not a guarantee. Mixes made with heavy aggregates, or specified as high-density, weigh more. If the mix isn't standard, ask the concrete supplier for its density and use that figure.

Step 2: add the skip and the rigging

The crane carries the concrete, the skip and anything between the skip and the hook. Using WOLFF's published weights:

Skip Concrete when full Skip weight Total before rigging
Conquip Coneflow 500 L 1,200 kg 170 kg 1,370 kg
Conquip Coneflow 1,000 L 2,400 kg 400 kg 2,800 kg
Eichinger 1025H 750 L 1,800 kg 360 kg 2,160 kg
Eichinger 1025H 1,000 L 2,400 kg 460 kg 2,860 kg
Eichinger 1034C 1,000 L 2,400 kg 380 kg 2,780 kg
Eichinger 1034C 2,000 L 4,800 kg 650 kg 5,450 kg

Then add any shackles, slings or other accessories between the skip and the hook. Your lift plan should also say whether the crane's chart already includes the hook block or whether it must be deducted. That depends on the crane, so check its chart and manual.

Step 3: check the skip's own rating

Separately, the concrete must not exceed the skip's rated load. Two patterns in WOLFF's published ratings are worth knowing:

  • Every Eichinger SWL on our product pages, on both the 1025H and the 1034C, works out at exactly 2.4 kg per litre (1,200 kg for 500 L, 2,400 kg for 1,000 L, and so on). In other words, a full skip of normal 2,400 kg/m³ concrete uses the whole rating. A denser mix in a full Eichinger skip would go over its SWL, so for a heavier mix choose a skip with more rating in hand rather than relying on a part-fill.
  • The Conquip Coneflow WLLs work out at 3 kg per litre (1,500 kg for 500 L, 3,000 kg for 1,000 L), which leaves some headroom over normal concrete.

Always go by the rating marked on the skip you actually receive. If it differs from the website, the marking on the skip is the one that counts.

Matching skip capacity to crane duty

A tower crane or mobile crane can lift less the further out the hook goes. The question isn't "what does the crane lift?" but "what does it lift at the furthest point of this pour?" On a slab, that is usually the far corner. On a column grid, it is the column furthest from the crane.

A worked example

Say the crane's chart allows 2,500 kg at the radius of the furthest bay, after the lift planner has taken off whatever must be deducted. Check each Eichinger 1025H size:

  • 1,000 L full: 2,400 + 460 = 2,860 kg. Over the duty.
  • 750 L full: 1,800 + 360 = 2,160 kg. Within the duty, leaving 340 kg for slings or shackles.

In theory you could run the 1,000 L skip part-filled: 2,500 − 460 = 2,040 kg of concrete, which is 0.85 m³. In practice, judging 850 litres in a skip filled from a truck chute is guesswork. The safer plan is the skip that is within duty when completely full. Plan as if every skip will be filled to capacity, because sooner or later one will be, and don't let it be heaped above its rated volume.

The trade-off: lift count

A smaller skip means more lifts. For 12 m³ of concrete, a 1,000 L skip needs at least 12 lifts and a 750 L skip at least 16. Work it out the other way round: start from the crane duty at the far radius, find the largest skip that fits when full, then see whether the lift count suits the pour programme. If it doesn't, the answer is a different crane position, a pump, or splitting the pour, not overloading the skip.

Things that reduce what you can lift

How to choose: eight questions

  1. What are you pouring? Columns, walls and narrow forms: a column (tremie) skip with a hose, such as the Conquip with bale arm or Eichinger 1034C. Slabs, foundations and trenches: the Eichinger 1025H or the Conquip Coneflow. The 1034C with its hose removed also pours slabs.
  2. What can the crane lift at the furthest pour radius? Take the duty from the chart, deduct whatever the lift plan requires, and pick the largest skip whose full weight plus self-weight fits.
  3. Is there a crane at all? If not, look at the Eichinger forklift pouring skip and check your forklift or telehandler's chart at the reach you need.
  4. How much headroom is there under the hook? If a bale arm won't clear, the Conquip four-point skip offers a lower-profile lift.
  5. How precise does the flow need to be? Stop-start column filling suits a lever or pull-cord gate with spring closure. Steady metering of a slab suits a geared wheel.
  6. Where will the operative stand? A 3 m pull cord (Eichinger 1034C) lets them stand back from the skip. Plan the position before the pour, not during it.
  7. How will the skip be filled? Check that the truck chute or pump hose can reach a skip lying in the laydown position, and that the ground there is firm and level.
  8. How will it be cleaned? Plan where the washout happens before the first load arrives (see below). The Eichinger kick-down hopper is designed for easier cleaning.

Four example scenarios, worked through

The examples below are typical scenarios, not records of particular jobs. Crane duties are made up for illustration. Always use the actual chart and lift plan for your crane.

1. Columns on a framed building

A contractor is pouring 400 × 400 mm columns, 3.5 m tall, from a tower crane. One column is 0.4 × 0.4 × 3.5 = 0.56 m³, about 1,344 kg of concrete. An Eichinger 1034C 1,000 L can fill one column per lift with some left over. The crane must still be checked for a full skip: 2,400 + 380 = 2,780 kg before rigging, at the furthest column. The 3 m hose goes down inside the form, and the pull cord lets the operative work the gate from the working platform without leaning under the skip.

2. Slab bays at long radius

A slab pour of 18 m³ sits at the edge of the crane's reach, where the duty (after deductions) is 2,500 kg. As worked above, an Eichinger 1025H 1,000 L is over the duty when full, but a 750 L is within it at 2,160 kg. The pour needs at least 24 lifts instead of 18. The team plans for that time, uses the geared wheel for steady discharge into each bay, and keeps the locking chain on the handle while the skip travels.

3. Footings on a site with no crane

A small extension needs strip footings, and there is no crane on site. The groundworker has a telehandler, so the Eichinger forklift pouring skip is the tool. A 1,000 L skip carries 2,400 kg of concrete before the skip's own weight, which isn't published, so get it from WOLFF. The telehandler's chart is checked at the reach needed to get over the trench. If the full load is too much at that reach, the 500 L size halves the concrete weight. The 1 m hose on the tremie adapter places concrete into the trench rather than over its edges.

4. Big wall pours under tight headroom

A core wall is being poured beneath a working deck where a bale arm won't clear. A Conquip skip without bale arm on its four-leg sling gives the lower profile. The contractor wants 3,000 L per lift: that is 7,200 kg of concrete alone, plus the skip and the sling. This skip's self-weight and WLL aren't on our product page, so the planner asks WOLFF for both before the crane and the skip rating are checked. If the crane can't take the full 3,000 L at that radius, the 2,000 L (4,800 kg of concrete) or 1,500 L (3,600 kg) is the next step down.

Washing out and cleaning a concrete skip

Concrete that sets in a skip is a common reason for a skip to stop working. It adds weight, jams the gate, stiffens the hose and can hide damage during inspection.

During the pour

  • Empty each load fully. Concrete left in the cone or gate from one lift is still there on the next.
  • Keep the gate area, deflector plate and grout tray clear between lifts. Conquip fits the grout tray to catch excess during gate operation, so empty it rather than letting it build up.
  • On long pours, check the hose for build-up inside. A partly blocked hose slows the flow and puts strain on the gate.

At the end of the pour

  • Wash out straight away, while the concrete is still wet. Eichinger designed the 1034C's kick-down hopper to make cleaning easier, and says the open barrel of the 1025H makes it "straightforward to clean residual concrete and grout from the skip body and gate area".
  • Flush the gate and run it through its full movement several times, so the spring retractor, pull cord or geared wheel still moves freely.
  • Clean the hose inside and out, or remove it to clean if the design allows (the 1034C hose can be taken off).
  • Don't hammer the skip body, cone or gate to free set concrete. Dents and distortion can stop the gate sealing and can damage the structure of the skip. If set concrete won't come off, take the skip out of use and get advice.

Where the washwater goes

Concrete washwater is strongly alkaline. It must not go into surface water drains, watercourses or onto open ground. Wash out in a designated washout area that contains the water and solids so they can be dealt with properly. WOLFF lists equipment for this in the concrete washout category.

Safety and UK rules

A concrete skip is part of a lifting operation, so the main UK rules for lifting apply.

LOLER: thorough examination

Under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), lifting accessories must have a thorough examination by a competent person at least every 6 months, or in line with a written examination scheme. A crane concrete skip, its bale arm and any sling or shackles used with it are all part of the lift, so make sure each has a current report of thorough examination before it goes on the hook. Equipment should also be examined after anything that might affect its safety, such as damage or a serious overload.

Between examinations, the user should check the skip before each shift. Look at the lifting points and bale arm, the bale arm pins and restraint chain, welds, the gate and its spring, the pull cord, and the hose fixing. Anything bent, cracked or not working takes the skip out of use.

Planning the lift

LOLER also requires lifting operations to be properly planned by a competent person, supervised appropriately and carried out safely. In the UK, BS 7121 is the code of practice for the safe use of cranes and is the usual reference for lift planning. For a concrete pour, the plan should cover the crane duty at the furthest pour radius, the full loaded weight of the skip, the fill position, the route of the lift, the pour position, signalling and the washout area. Our tower crane lifting equipment guide covers the other accessories on a typical crane job, and the spider crane vs mini crawler vs tower crane guide helps if you are still choosing the crane.

PUWER

A concrete skip is also work equipment under the Provision and Use of Work Equipment Regulations 1998 (PUWER). It must be suitable for the job, maintained in a safe condition, and used by people who have the information and training to use it safely. Keep the manufacturer's instructions and the Declaration of Conformity with the skip. Our product page for the Eichinger forklift pouring skip states that an EC Declaration of Conformity is supplied with every unit.

On the pour

  • Never stand under a suspended skip. Conquip notes that with its Coneflow "operators stand alongside the skip rather than underneath it during the pour", and the Eichinger 1034C's 3 m pull cord lets the operative open the gate from a distance.
  • Keep the gate locked during filling and travel. The 1025H uses a locking chain on the gate handle to prevent accidental discharge.
  • Expect the skip to move as it empties. The hook load falls as concrete leaves, so the skip can rise or swing. Keep hands clear of pinch points and guide the skip with care.
  • Never use a concrete skip to lift people. For that, see the access cages and man baskets range and our guide to lifting people by crane with man baskets.

Common mistakes

  1. Sizing on volume. "The crane lifts 2 tonnes, so a 1,000 L skip is fine" ignores that 1,000 L of concrete is about 2.4 t before the skip is added.
  2. Checking the duty at the wrong radius. The truck is often close to the crane. The far corner of the slab isn't.
  3. Planning on part-fills. If the plan only works with the skip three-quarters full, one full load breaks it. Choose a size that is within duty when full.
  4. Using a waste skip for concrete. A boat skip or tipping skip dumps everything at once and can't place concrete into a form.
  5. Pouring columns without the hose. Letting concrete free-fall the full height of a column form risks segregation. The hose is there for a reason.
  6. Letting concrete set in the gate. Clean as you go and wash out straight after the last load.
  7. Losing the paperwork. No current thorough examination report means the skip shouldn't be lifted. The four-leg sling on a four-point skip needs its own report.

From the WOLFF team

These examples come from real enquiries, quotes and orders we have handled. Customer details are left out.

Matching the skip to the material

A materials company asked us to price concrete skips for a mix that doesn't flow like standard concrete. We recommended a column skip, with a Coneflow skip as an alternative, rather than the basic forkliftable pouring skip. The pouring skip is designed around the flow of wet concrete and might not discharge their material as reliably. Asking what's going into the skip, not just how many litres, changed the recommendation.

Skips and washout together

For a London-area project, a contractor needed three 1,000-litre concrete skips with bale arms, plus skip washing platforms and drip trays to match. We gave them two options: a UK-made range that was in stock, and a German-made range at a lower price that had to be confirmed with the factory. They could then weigh price against how quickly they needed the kit on site.

Frequently asked questions

How much does a full 1 m³ concrete skip weigh?

A cubic metre (1,000 litres) of normal-weight concrete is about 2,400 kg. Add the skip itself: 380 kg for an Eichinger 1034C 1,000 L column skip, 400 kg for a Conquip Coneflow 1,000 L, or 460 kg for an Eichinger 1025H 1,000 L. Then add any rigging. So a full 1,000 L skip puts about 2.8 to 2.9 tonnes on the hook before rigging.

What size concrete skip do I need?

Start from what the crane can lift at the furthest point of the pour, not from the pour volume. Choose the largest skip whose full concrete weight plus self-weight (plus rigging) fits that duty, then check the lift count suits your programme. WOLFF's crane skips run from 500 L to 4,000 L.

What is a banana skip?

A banana skip is the site name for a cone-shaped coneflow skip, such as the Conquip Concrete Coneflow Skip. It lies flat to be filled, hangs upright to pour, and uses a funnelled outlet with a geared flow gate for directional pouring. WOLFF stocks it in 500, 750 and 1,000 litre sizes.

What is a tremie skip?

A tremie skip is a column skip with a discharge hose, used to place concrete down into columns, walls and narrow formwork. Conquip uses the name for its Concrete Skip With Bale Arm, which comes with a 3 m reinforced rubber hose. The Eichinger 1034C column skip works the same way with a 200 mm × 3 m hose.

Should I choose a concrete skip with or without a bale arm?

A bale arm gives a quick single-point connection to the crane hook with no separate sling. A skip without a bale arm, such as the Conquip four-point skip, hangs from a supplied four-leg chain sling and gives a lower-profile lift for restricted headroom. It is also available in larger sizes, up to 4,000 L.

Can I pour concrete with a forklift or telehandler instead of a crane?

Yes, with a fork-mounted pouring skip such as the Eichinger Forklift Concrete Pouring Skip (Model 2016). It has a lever-operated side outlet and a 200 mm tremie adapter with a 1 m hose. Check your machine's load chart at the reach you need, using the full concrete weight plus the skip's weight.

How often does a concrete skip need a thorough examination?

Crane concrete skips and the slings or shackles used with them are generally treated as lifting accessories under LOLER 1998, so they need a thorough examination by a competent person at least every 6 months, or in line with a written examination scheme. They also need a pre-use check by the user before each shift.

How do I clean a concrete skip?

Empty each load fully, keep the gate and grout tray clear during the day, and wash out straight after the last pour while the concrete is still wet. Work the gate through its full movement and clean the hose. Don't hammer set concrete off, and always wash out into a contained washout area, never a drain.

Where next

Categories: Concrete skips · All skips · Concrete washout · Waste skips · Tipping skips · Fork-mounted skips · Forklift attachments · Chain slings · Lifting equipment

Concrete skips in this guide: Conquip Concrete Skip With Bale Arm · Conquip Concrete Skip Without Bale Arm · Eichinger Concrete Column Skip · Conquip Concrete Coneflow Skip · Eichinger 1025H (Coneflow Concrete Skip) · Forklift Concrete Pouring Skip

For waste and materials, not pouring: Crane Slung Boat Skip · Crane and Forklift Drop Bottom Skip · Conquip Forklift Tipping Skip · Forklift Self Tipping Skip

Related guides: Tower crane lifting equipment and accessories · Wind speed limits for tower crane operations · Load navigation systems · Crane camera systems · Two-way radios for construction sites · Tipping skips explained · Forklift attachments: the complete guide · Chain sling grades · Lifting frame vs spreader beam vs lifting beam · Spider crane vs mini crawler vs tower crane

Send us your crane's duty at the pour radius, the volume and type of pour, and how the skip will be filled, and we'll help you choose a concrete skip. Email hello@wolffonsite.co.uk, call 01709 437141, or contact our team.