Lifting frame vs spreader beam vs lifting beam: which do you need?

Published 30 October 2026 26 min read
Lifting frame vs spreader beam vs lifting beam: which do you need?

The quick answer

A lifting beam takes the load in bending and needs the least headroom, but it is the heaviest for its capacity. A spreader beam takes the load in compression, so it is lighter and spans further, but its angled top slings need more height above it. A lifting frame spreads the load in two directions for four-point lifts. Choose a lifting beam when headroom is tight, a spreader beam for long or heavy loads with height to spare, and a frame for boxes, modules, containers or bulk bags that must not be squeezed.

All three do the same basic job: they sit between the crane hook and the load, so the load can be lifted from more than one point without the slings crushing, twisting or tipping it. The difference is how the beam carries the force and which direction it spreads the load.

  • A lifting beam hangs from one or two points on top and takes the load in bending. It needs the least headroom, but it is the heaviest for its capacity.
  • A spreader beam hangs from two angled top slings and takes the load in compression. It is lighter and can span much further, but it needs more headroom above the beam.
  • A lifting frame spreads the load in two directions, usually from four points. Use it when a square or rectangular load needs vertical slings on all four corners.
Lifting beam Spreader beam Lifting frame
How it carries the load Bending Compression Bending or compression, in two directions
Lift points under it Two or more, in a line Two, one at each end Usually four, at the corners
Headroom needed Lowest Highest (top slings are angled) Medium to high
Self-weight for its capacity Heaviest Lightest Depends on design
Typical span Short to medium Medium to very long (modular) Square or rectangular footprint
Best for Low headroom, multi-point or uneven loads Long, heavy loads with height to spare Modules, pods, boxes, bags, IBCs
WOLFF range Lifting beams Spreader beams Lifting frames

The rest of this guide explains each one, how to choose between them, and the checks the law expects before any of them goes on a hook.

How the three rigs differ at a glance

Where the force goes decides how much headroom you needLifting beamTakes the load in bendingLowest headroom, heaviest beamSpreader beamTakes the load in compressionLightest, but needs more heightLifting frameSpreads the load in two directionsFour vertical drops on a box load

Look at where the slings go. Under all three, the slings or chains to the load hang straight down, so the load isn't squeezed. Above a lifting beam there is only a short link to the hook, so the whole rig is compact. Above a spreader beam the two top slings run out at an angle to the ends of the beam. That angle pushes the ends of the beam towards each other, so the beam carries the load in compression and can be made much lighter. The cost is height: the top slings need room between the hook and the beam. A lifting frame does the same job as a spreader or beam, but in two directions at once, so all four corners of a box-shaped load get a vertical lift.

Key terms you'll see on data sheets

Below-the-hook equipment has its own vocabulary, and suppliers don't always use it the same way. These are the terms used in this guide and on most UK data sheets.

Term What it means
WLL (working load limit) The maximum load the beam or frame is designed to lift in a stated configuration. SWL (safe working load) is often used to mean the same thing; WLL is the term used in current standards.
UDL (uniformly distributed load) A rating that assumes the load is spread evenly along the beam rather than hung from one point.
Lifting centres The distance between the lifting points under a spreader beam. On a modular beam, the struts you fit set this distance.
Top slings The slings that run from the crane hook to the top lugs at each end of a spreader beam. Their angle sets the rating and the headroom.
Sling angle to vertical (STV) The angle between each top sling and an imaginary vertical line. 0 degrees is straight up; the bigger the angle, the flatter the sling.
End unit The fitting at each end of a modular spreader beam, carrying the top lug and the connection to the load below.
Drop link The link that hangs below each end unit, which the load's rigging attaches to.
Strut A tubular section bolted between the end units. Adding or removing struts changes the span.
Corner unit The fitting that joins struts at 90 degrees to turn a modular spreader system into a four-point frame.
Centre of gravity (CoG) The point the load's weight acts through. The hook must sit directly above it, or the load will tilt as it lifts.
Headroom The vertical space available between the highest safe hook position and the top of the load.
Rig weight The combined weight of the beam or frame, shackles, slings and anything else between the hook and the load.

Lifting beams: compact, rigid, low headroom

Adjustable lifting beam with four slidable lift points, rated up to 10,000kg WLL

A lifting beam is a stiff steel section with a lifting point on top, usually a single eye or a pair of eyes close together, and a row of lifting points underneath. The crane pulls up in the middle while the load pulls down at the ends, so the beam takes the load in bending, like a shelf with weight at both ends. To resist that bending, the section has to be deep and strong, which is why a lifting beam weighs more than a spreader beam of the same capacity.

The pay-off is height. With no angled slings above the beam, the hook can come almost straight down onto it. That matters when you are lifting inside a building, under a gantry or an overhead crane with a limited hook height, or when the crane is already near the top of its hook travel.

When a lifting beam is the right choice

  • Low headroom: the rig from hook to load is as short as it gets.
  • More than two lift points: a beam can have three, four or more points along its length, so it suits long, flexible loads such as pipes, steel sections, cladding panels or reinforcement that would sag between two points.
  • Off-centre or uneven loads: an adjustable beam lets you slide the lift points so the hook sits over the centre of gravity and the load hangs level.
  • Short to medium spans: past a certain length the weight of a beam in bending becomes a real penalty, and a spreader beam takes over.

Lifting beams in the WOLFF range

  • Craneable Lifting Beam: 5,000kg WLL, two topside crane attachments and multiple underside lift points, UK-made from Grade S355 steel.
  • Adjustable Lifting Beam: up to 10,000kg WLL with four slidable lift points for offset loads. The beam itself weighs 500kg, so allow for that in the lift plan.
  • Conquip Lifting Beam: 5,000kg WLL with a factor of safety of 3, in 3m, 5m and 7m lengths.
  • Conquip Adjustable Lifting Beam: 10,000kg WLL with four slidable lifting points, popular for modular bathroom pods and other uneven loads.
  • Multi-Sec MP-13 and MP-25 multi-point beams: rated to 13 and 25 tonnes. One beam can be rigged as a centre-point lifting beam, a spreader or a semi-spreader, with forklift pockets for handling on site.
Multi-Sec MP-13 and MP-25 multi-point lifting beams

There are also beams for specialist jobs from Invicta, the Leeds attachment maker. The Invicta Battery Lifting Beam mounts on forklift tines for changing forklift batteries (1,000 to 2,000kg SWL). The Invicta Spreader Beam is slung from a crane or excavator to lift and lay rolls and liners (1,700kg UDL).

See the full range of lifting beams.

Centre of gravity: getting a level lift

Whatever rig you use, a load always hangs with its centre of gravity directly below the hook. If the lifting points are symmetrical about the centre of gravity, the load comes up level. If they aren't, it tilts until the centre of gravity is under the hook, and that is when loads slide, swing or shift in their packing.

For a symmetrical load, such as a straight steel section or a standard container, the centre of gravity is close to the middle. For anything else, such as a pod with a heavy end, a plant skid with an engine at one side or a precast unit with a recess, get the position from the manufacturer's drawings or the load's lifting data. If there is no data, it has to be worked out by a competent person before the lift, not discovered during it.

Once you know where the centre of gravity is, there are three ways to get a level lift:

  • Move the lift points. This is what an adjustable lifting beam is for. Slide the lift points so the beam's top attachment sits over the centre of gravity.
  • Use a beam with several top positions. Multi-point beams like the Multi-Sec MP range have several drilled lifting positions, so you can choose the one closest to the centre of gravity.
  • Change the rigging lengths. On a spreader beam, the drop rigging can be set to different lengths so the load hangs level. This needs care, because it changes how the load is shared between the ends.

There is one more check that is easy to miss. With an off-centre load, one end of the beam carries more than half the weight. Some beams have a rating for each lift point as well as an overall WLL, so make sure the heavier end is within its own limit, not just the total.

Spreader beams: light, long and modular

Multi-Sec Multi 50 modular spreader beam system with end units, struts and drop links

A spreader beam hangs from two top slings that run from the crane hook out to each end of the beam. Because those slings are angled, they pull the ends of the beam inwards as well as upwards. The beam's job is to hold the ends apart, so it is loaded mainly in compression, like a strut in a roof truss. A section in compression can be far lighter than one in bending, so for the same capacity a spreader beam weighs much less than a lifting beam and can span much further.

Under the beam, the drop slings hang vertically to the load. The load gets a straight lift with no side squeeze, which is the point of the exercise: long loads such as precast units, steel trusses, tanks, plant and vessels don't get crushed or bent by angled slings.

The sling angle sets both the rating and the headroom

A spreader beam's capacity is always quoted at a stated top-sling angle. The flatter the slings, the harder they pull inwards and the more compression the beam has to carry. That is why the Modulift MOD6 3m is rated at 6 tonnes with the top slings at 30 degrees to vertical but 5 tonnes at 45 degrees.

The same angle decides how much height you need above the beam. Simple geometry gives the height of the top slings for a given span:

Span between lift points Top-sling height at 45° to vertical Top-sling height at 30° to vertical
4m 2.0m 3.5m
6m 3.0m 5.2m
10m 5.0m 8.7m

Add the depth of the beam, the drop slings and the load, and you have the hook height the lift needs. If there isn't enough room, you either accept a lower rating at a flatter angle (if the beam allows it) or switch to a lifting beam.

Modular spreader beams

A modular spreader beam is a kit: two end units, two drop links and a set of bolt-together struts. Add or remove struts to change the span, so one kit covers many jobs. The Multi-Sec range at WOLFF is DNV type approved, and each complete system comes with end units, drop links, struts, bolts and shackles. Multi-Sec publishes its configuration details on its modular spreader beams page.

System Rated capacity Maximum lifting centres
Multi 13 13 tonnes 5.75m
Multi 25 25 tonnes 7.25m
Multi 50 50 tonnes 9.5m
Multi 75 75 tonnes 12m
Multi 110 110 tonnes 14.5m
Multi 170 170 tonnes 14.5m
Multi 250 250 tonnes 15.5m

Struts, end units, drop links and corner units are also sold separately, so you can extend a kit you already own. For the heaviest lifts, the Modulift MOD 250 series runs from 250 tonnes at 14m to 400 tonnes at 11m. The full Modulift range is on Modulift's spreader beams page.

When a spreader beam is the right choice

  • Long loads, where a beam in bending would be too heavy to handle or to put on the hook.
  • Heavy loads, where every tonne of rigging weight eats into the crane's capacity.
  • Variable jobs, where a modular kit can be rebuilt to a new span instead of buying another fixed beam.
  • Enough hook height, at the sling angle the rating needs.

Browse spreader beams or go straight to modular spreader beams.

Rigging a modular spreader beam: the order of work

Modular beams are simple to build, but because they can be built so many ways, they're also easy to build wrongly. Always follow the manufacturer's instructions and configuration chart for your kit. The general order of work looks like this:

  1. Pick the configuration from the chart. Confirm the span you need, the capacity at that span, the top-sling angle the rating assumes, and the top-sling length that gives that angle.
  2. Lay out and inspect every part. Work on level ground. Check each end unit, strut and drop link for damage, corrosion and legible markings. Make sure every part belongs to the same series and rating. A Multi 25 strut doesn't belong in a Multi 50 beam.
  3. Assemble the beam. Bolt the struts and end units together with the bolts supplied for that system, tightened as the instructions specify.
  4. Fit the drop links and shackles. Use shackles of the size and rating the system calls for, with pins fully engaged and secured.
  5. Fit matched top slings. Both top slings must be the same length and rating, and long enough to keep the sling angle within the rated limit.
  6. Check against the lift plan, then trial lift. Have the person supervising the lift check the assembled rig against the plan. Then take the load a few centimetres off the ground and check that it hangs level and the beam is straight before going higher.
  7. Strip down and store. After the job, dismantle the beam, check the parts again and store them so struts don't get bent or bolts lost.

Buying a complete Multi-Sec system means the end units, drop links, struts, bolts and shackles arrive as one matched kit, which makes the same-series check in step 2 straightforward.

Lifting frames: four corners, vertical drops

Multi-Sec Multi F modular lifting frame built from four corner units and struts

A beam or spreader controls the load in one direction only. Pick up a box-shaped load with four slings from one hook and the slings pull the top corners inwards. With a long load you can fix that with a spreader. With a square or rectangular load, such as a modular building unit, a bathroom pod, a plant skid or a container, the slings pull inwards on both sides. A lifting frame solves this by spreading the lift points in both directions, so all four drops hang vertically and nothing is squeezed.

There are two broad kinds.

Modular lifting frames

A modular frame is built from four corner units joined by struts. The Multi-Sec Multi F frames use the same struts as the Multi spreader beams. If you already own a Multi beam, four corner units turn it into a frame. Every Multi F frame is DNV type approved.

Frame Rated capacity Maximum span
Multi F 13 13 tonnes 6m x 6m
Multi F 25 25 tonnes 7m x 7m
Multi F 50 50 tonnes 9m x 9m
Multi F 75 75 tonnes 12m x 12m
Multi F 110 110 tonnes 14m x 14m
Multi F 170 170 tonnes 15m x 15m
Multi F 250 250 tonnes 16m x 16m

Because the struts are interchangeable, the frame's size is set by the struts you fit, up to the maximum span. Tell us where the load's lifting points are, and we'll confirm the strut set for that footprint.

Purpose-built lifting frames

For loads you move again and again on site, a dedicated frame is quicker and safer than rigging slings each time. These frames carry the load rather than just spreading the slings, and several have fork pockets so they can also be moved by telehandler or forklift.

Full specifications for the Conquip frames are on Conquip's website.

Front view of the Conquip IBC lifting frame, a four-point frame for lifting intermediate bulk containers

See every option in lifting frames or the modular lifting frames range.

How to choose: five questions

Work through these in order. Most lifts are settled by question 3.

  1. What shape is the load? If it's long and thin, you need a beam or a spreader. If it's square or rectangular and needs lifting from four corners, you need a frame. If it's a load you handle every day, such as IBCs, toilets, rebar, glass or bulk bags, a purpose-built frame will save time on every lift.
  2. Where are its lifting points, and where is the centre of gravity? Measure the distance between the lifting points, because that sets the span. If the centre of gravity isn't central, you need adjustable lift points (an adjustable lifting beam) or a rig set up so the hook sits over the centre of gravity.
  3. How much headroom is there? Measure from the highest safe hook position down to the top of the load. If it's tight, use a lifting beam. If there's plenty, a spreader beam is usually lighter and longer (see the sling-height table above).
  4. What does the whole rig weigh? The crane has to lift the load plus the beam or frame, shackles and slings, and usually the hook block too, depending on how its duty chart is stated. A heavy beam can push a lift over the crane's duty at the radius you need, and that's where a lighter spreader beam earns its place.
  5. Will you use it once or many times? For a one-off lift at an unusual span, a modular kit makes sense. For repeat lifts of the same load, a fixed beam or purpose-built frame is quicker to rig and less likely to be set up wrongly.
Your situation Start with
Low ceiling, overhead crane or limited hook height Lifting beam
Off-centre load, or a load that needs adjusting to hang level Adjustable lifting beam
Long or heavy load with plenty of hook height Modular spreader beam
Modular unit, pod, skid or container lifted from four corners Modular lifting frame
IBCs, portable toilets, rebar, glass or bulk bags Purpose-built lifting frame
Different jobs at different spans One Multi-Sec strut set, used as a beam or a frame

If you aren't sure, send us the load weight, its dimensions, where the lifting points are and the hook height you have. We'll tell you which rig fits.

Four example lifts, worked through

The examples below are typical scenarios, not records of particular jobs. They show how the five questions narrow the choice. Every real lift still needs its own plan from a competent person, based on the actual load data and crane duty.

Example 1: a long steel section inside a building

The lift: a 6.5m steel section weighing about 3 tonnes, lifted by an overhead crane in a factory with limited hook height. The section has to be picked up near each end so it doesn't bend.

The thinking: the load is long and thin, so it's a beam or a spreader. Headroom is tight, which rules out a spreader beam's angled top slings. Three tonnes is well within the range of fixed beams.

The choice: a lifting beam. The Conquip Lifting Beam in its 7m length (5,000kg WLL) is long enough to pick the section near each end and keeps the rig short under the hook; check the underside lift-point positions suit the section before ordering. The beam's own weight is added to the load when checking the overhead crane's capacity.

Example 2: a precast unit lifted by a mobile crane

The lift: a precast concrete unit weighing about 20 tonnes, with cast-in lifting points 7m apart, lifted outdoors by a mobile crane with plenty of hook height.

The thinking: the load is long and heavy. A lifting beam strong enough to span 7m in bending at 20 tonnes would be very heavy, and that weight comes off the crane's capacity. With height to spare, a spreader beam is the lighter answer.

The choice: a modular spreader beam. The Multi 25 is rated to 25 tonnes with lifting centres up to 7.25m, so a 7m span is within its range. The planner checks the rated top-sling angle for that configuration on the chart. At 45 degrees to vertical, the top slings would need about 3.5m of height above the beam. At 30 degrees they'd need about 6.1m, so the hook height has to allow for whichever applies.

Example 3: a modular bathroom pod

The lift: a bathroom pod with lifting points at its four top corners, roughly 2.4m by 4.0m apart, lifted into a building under construction by a tower crane.

The thinking: the load is a box with finished walls. Four slings straight to one hook would pull the top corners inwards and risk damaging the pod. It needs vertical drops at all four corners, which means a frame.

The choice: a modular lifting frame. The Multi F 13 is rated to 13 tonnes with spans up to 6m x 6m, comfortably more than this footprint. Ask us to confirm a strut set that builds to these lifting centres, as the smallest size a frame can be built to depends on its corner units and struts. The frame's weight, the pod's weight and all the rigging go into the tower crane's duty check at the landing radius. If the pod's centre of gravity is off-centre, the drop rigging is set up to suit, as described above.

Example 4: bulk bags delivered every week

The lift: one-tonne bulk bags of aggregate delivered to site every week and moved by forklift and sometimes by crane.

The thinking: this is a repeat lift of the same load. Rigging slings for every bag wastes time and invites mistakes. A purpose-built frame does the job the same way every time.

The choice: a purpose-built frame. The Eichinger Big Bag Lifting Frame takes the bag's four loops on large-radius pins and can be lifted by crane, Hiab or forklift. If a forklift is the main machine, also look at the bulk bag lifters in the forklift attachments range.

Fixed, modular or purpose-built?

Once you know which type of rig you need, there's one more decision: buy a fixed beam, a modular kit or a frame made for one job.

A fixed beam or frame is the simplest. There's nothing to assemble, so nothing can be assembled wrongly, and it's ready to use the moment it comes off the wagon. It suits sites that do the same lift over and over at the same span. The downside is that it does one span only, and long fixed beams are awkward to transport and store.

A modular kit may cost more at first than a single fixed beam of the same capacity, but one kit covers a whole range of spans. It can also become a four-point frame by adding corner units. It packs down for transport, and individual parts can be replaced or added later. The trade-off is set-up time, plus the need for someone competent to build it to the right configuration every time.

A purpose-built frame is the right answer for a load you handle constantly: IBCs, toilets, rebar, glass or bulk bags. It often carries the load as well as lifting it, may have fork pockets for moving it without a crane, and turns a lift that needs slinging skills into a routine one.

Many contractors end up with a mix: a modular kit for the big, varied lifts, and a couple of purpose-built frames for the everyday ones.

Safety and the law: what the UK rules expect

In law, lifting beams, spreader beams and lifting frames are all lifting accessories: they sit between the crane and the load. That brings them under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), alongside PUWER. In practice, that means:

  • Thorough examination at least every 6 months. LOLER sets 6 months as the maximum interval for lifting accessories, unless a written scheme of examination set by a competent person says otherwise. An accessory also needs a thorough examination before it is first put into service, unless it is new and comes with a declaration of conformity made not more than 12 months before it goes into service. Keep the latest report with the equipment or where the lift team can see it.
  • Clear marking. The beam or frame has to be marked with its safe working load (SWL, often shown as WLL) and any information needed to use it safely, such as the sling angle the rating applies to. If it can be built in more than one configuration, such as a modular spreader or frame, the rating for each set-up must be clear.
  • A planned lift. Every lift has to be planned by a competent person, supervised appropriately and carried out safely. In the UK, BS 7121 is the code of practice for the safe use of cranes and sets out how lifts are planned.
  • Equipment built to a recognised standard. Lifting beams and spreader beams fall within the scope of BS EN 13155, the European standard for non-fixed load lifting attachments. Check the declaration of conformity for the standard a particular beam or frame is built to.

Checks before every lift

  • Check the marked WLL covers the load and that the rig is set up for that rating (span, sling angle, strut configuration).
  • Add the weight of the beam or frame and all the rigging to the load when you check the crane's duty.
  • Look for bending, cracks, damaged welds, worn holes and corrosion. If in doubt, don't use it.
  • Make sure every pin and bolt is fitted and secured, and that shackles are the right size and rating for the lugs.
  • Confirm the drop slings will hang vertically and the hook will sit over the load's centre of gravity. Lift a few centimetres first and check the load hangs level before going any higher.

This section is a summary, not legal advice. Your appointed person and lift plan have the final say.

Common mistakes

  • Using the beam's rating at the wrong sling angle. A rating given at 30 degrees to vertical does not apply if shorter top slings flatten the angle to, say, 45 degrees; the rating is lower there. For the same span, shorter top slings mean a flatter angle and longer slings a steeper one. Check the marking for the configuration you are actually rigging.
  • Forgetting the rig weight. A 10-tonne adjustable beam that weighs 500kg is half a tonne of crane capacity before the load leaves the ground. On a long-radius lift, that can be the difference between in duty and out of duty.
  • Mixing parts from different modular systems. Struts, end units and drop links are rated as a system. Only use components from the same range and rating, and build them exactly as the manufacturer's configuration sheet shows.
  • Choosing a spreader beam with no room above it. If the top slings can't reach their rated angle under the hook, the rig doesn't work. Measure the hook height before ordering, not on the day.
  • Slinging a box load from one hook with no frame. Four slings to one hook pull the corners of a pod or module inwards. That causes cracked finishes, racked frames and damaged lifting points.
  • Lifting off-centre without adjusting. If the load tips as it leaves the ground, the hook isn't over the centre of gravity. Set the load down and adjust; don't let the crew steady it by hand.

From the WOLFF team

These examples come from real enquiries, quotes and orders we have handled. Customer details are left out.

A custom H-frame for modular units under overhead cables

We supplied custom H-frames to a modular building company to move their units. The units were 3m high and the site had overhead cables at around 6m, so the lift had to stay as low to the ground as possible. Once the unit height was taken off, there wasn't enough clearance for the top slings of a spreader beam or a standard modular frame. Our standard hire frames also cover lifting point centres up to 6,000mm, and these units were 8m long. The answer was an H-frame made to order: 8m long and 3m wide, with a WLL of 6 tonnes and a single central lift point, picking up the unit at all four corners on screw-in lifting eyes. A single central lift point keeps the rigging above the frame short, which is what saves the headroom.

Checking the spans before quoting

A structural steel contractor asked for a three-beam modular spreader system: one longer top beam with two shorter beams hung beneath it. The total length in their enquiry didn't match the beam lengths they listed, so we quoted to the individual beam lengths. We used a Multi-Sec Multi 25 for the top beam and two Multi 13 beams below, with matching safety shackles as options.

Frequently asked questions

What is the difference between a lifting beam and a spreader beam?

A lifting beam hangs from a point on top and carries the load in bending, so it needs little headroom but is heavier. A spreader beam hangs from two angled top slings and carries the load in compression, so it is lighter and can span further, but it needs more height above the beam.

When should I use a lifting frame instead of a spreader beam?

Use a lifting frame when a load has to be lifted from four corners and must not be squeezed from the sides, such as a modular unit, bathroom pod, skid or container. A spreader beam only controls the load in one direction.

How often does a lifting beam need a thorough examination?

Under LOLER, lifting accessories such as lifting beams, spreader beams and lifting frames need a thorough examination at least every 6 months, unless a written scheme of examination sets a different interval.

Can a spreader beam be used as a lifting beam?

Not unless it is designed for it. A spreader beam is designed for compression and may not be rated for bending. Some beams, such as the Multi-Sec MP-13 and MP-25, are designed to be rigged as a lifting beam, a spreader or a semi-spreader. Always follow the rating for the configuration you use.

Does the weight of the beam count towards the crane's capacity?

Yes. The crane lifts the load plus the beam or frame, slings and shackles, and usually the hook block too (check how the crane's duty chart treats it), so all of them must be included when you check the crane's duty at the working radius.

Can one modular kit be used as both a spreader beam and a lifting frame?

With the Multi-Sec system, yes. The Multi F frames use the same struts as the Multi spreader beams, so adding four corner units of the matching rating turns a spreader beam into a four-point frame.

What does STV mean on a spreader beam rating?

STV stands for sling to vertical. It is the angle between each top sling and a vertical line through the lug. A spreader rated "6t at 30° STV" can lift 6 tonnes only when its top slings are no flatter than 30 degrees from vertical.

Is WLL the same as SWL?

In everyday use, yes: both mean the maximum load the equipment should lift in a given configuration. Working load limit (WLL) is the term used in current standards and on most new equipment.

Do I need a lift plan for a simple beam lift?

Yes. LOLER requires every lifting operation to be properly planned by a competent person. The plan can be short for a simple, repeated lift, but it still has to exist and cover the load, the rig, the crane and the people involved.

How do I find the centre of gravity of an awkward load?

Use the manufacturer's drawings or lifting data first. If there are none, a competent person should work it out before the lift. A short trial lift, a few centimetres off the ground, shows whether the load hangs level before anyone commits to a full lift.

Where next

Not sure which rig your lift needs? Send us the load weight, dimensions, lifting point positions and available hook height. We'll recommend the right beam or frame. Email hello@wolffonsite.co.uk, call 01709 437141, or contact our team.